P W.E. New Kowloon
Q 100
The following roads within the Shamshuipo and Cheung Sha Wan Districts, in front of new buildings, were kerbed, channelled, surfaced with ordinary macadam and tar painted, the footpaths being paved with granolithic slabs and necessary improvements made:
Yu Chau Street Kai Tack Street
Un Chau Street Sam Tack Street
Peiho Street Castle Peak Road
Kai Yee Road
Nan Chang Street Tai Nan Street
Cheung Sha Wan Road Om Yau Street
Apliu Street
Tin Lui Street
New Street off Prince Edward Road.
1926 Estimates, $5,000.00
1926 Sup. Vote, $45,000.00
$50,000.00
1926 Expenditure, $43,970.32
154. Training Nullahs:-
(a.) Side-wall and Invert of Nullah East side of Kaulung-tong Development Scheme. This work was referred to in paragraph 212 (a) of last year's Report.
Very good progress was maintained. A good length of parapet walling was completed, and a length of 808 lin. feet of decking was laid.
1926 Estimates, $75,000.00 Total Estimates.
1926 Expenditure, $74,961.57 Expenditure to 31.12.26,
$192,000.00 $172,030.40
(b.) Kaulungtong Development Area,-Connection Stream North of Hill Area to Main Nullah.—This work was referred to in paragraph 212 (b) of last year's Report.
Good progress was made with the building of side-walls and the construction of the invert to the catchwater.
1926 Estimates, $10,000.00 Total Estimates,
1926 Expenditure, $5,840.15 Expenditure to 31.12.26,
$60,000.00 $15,788.63
(c.) General Works. The cutting of trenches to prevent the formation of mosquito breeding pools was carried on during the year.
The nullah on the west side of Lai Chi Kok Prison was extended.
1926 Estimates, $10,000.00
1926 Expenditure, $5,470.49