Size. Description. Length.

Locality.

95

P.W.E. Kowloon

Position.

Remarks.

21" & Stormwater 235'

18"

drains.

Yaumati.

In Public Square Street to Nathan Road and in Nathan Road from Public Square Street to Market Street.

Tai Kok Tsui. Through Tai Kok Tsui

Completed.

24"

Combined Sewer and Stormwater

drain.

18" 21" Stormwater

24" 36"

drains.

Prince Edward Avenue.

42" 51"

& 60'

45" 54" & 60"

27

Reclamation, Street.

Oak

Not Com-

pleted.

In Prince Edward Avenue!

from East of No. 7 Railway Bridge to Mong Kok Nullah.

Waterloo Road Iu Waterloo Road, ex- tension to Kowloon Hospital.

24" & 21"

Yaumati.

In Gascoigne Road op- posite Kansu Street Northwards.

The number of drain connections made was 88.

1926 Estimates,

$92,928.38

1926 Sup. Vote,

$ 75,000.00 101,750.00

$176,750.00

1926 Expenditure to 31.12.26

446.65

1926 Net Expenditure to

31.12.26 (from Govern- ment funds),

(contributions by various

$ 93,375.03

lessees),

Many new gullies were constructed and connected to the stormwater drainage system.

Share This Page