93
P.W.E. Kowloon
(c.) Kaulungtong Old Village Area, Stormwater Drain to Mongkoktsui Nullah-This work was referred to in paragraph 179 (c) of last year's Report. Good progress was made.
$50,000.00 Total Estimates,
1926 Estimates. 1926 Expenditure, . $49,805.03 Expenditure to 31.12.26,
$80,000.00
$55,354.28
(d.) General Works.-The following are the most important stormwater drains and sewers which were laid during the year:-
Size Description Length Locality Position Remarks 30" & 18" Sewer 710' Fuk Tsun Heung From Fuk Tsun Heung to near the Old Boundary and to K.I.L. 1635, Lai Chi Kok Road. Completed. 6" 280' In scavenging lane behind K.I.Ls. 1659, 1646, and 1562. 6" 100' Hill of the King of the Sung. In scavenging lane behind H.H.I.L. 262. 6" 95' Hung Hom In scavenging lane behind H.H.I.L. 265. 9" Stormwater drain 285' Laichikok Road, Mong Kok. From Baker Street along first 40 road East of Chatham Road to Cooke Street and along Cooke Street to Nullah. 9" & 6" Sewer 650' Opposite scavenging lane to K.I.L. 1638 and in scavenging lane to K.I.L. 1969.39