P.W.E. Kowloon,

Q 112

Size. Description. Length in feet. Locality. Position. Remarks. 9" & 6" Sewer Mataukok From K.I.Ls. 640 to 1445 Not completed 6" Portland St. In scavenging lane of K.I.L. 752 between Waterloo Road and Pitt Street 6" Do. Pitt Street 6" Middle Road Portland 6" 27 Do. 6" Shek Lung Street 6" 21 Temple Street 6" Battery Street 6" Ningpo Street 6" Shanghai Street 6" 19 Laichikok Road 6" Jordan Road In scavenging lane of K.I.L. 753 between Waterloo Road and Pitt Street In scavenging lane at rear of K.I.L. 1139 Between Hankow and Nathan Roads In scavenging lane at rear of K.I.L. 759 27 In scavenging lane at rear of K.I.L. 760 In scavenging lane at rear of K.I.L. 748 21 In scavenging lane at rear of K.I.L. 1355, Temple and Market Streets In scavenging lane at rear of K.I.L. 1557 A In scavenging lane at rear of K.I.Ls. 311 & 327 In scavenging lane at rear of K.I.Ls. 156 & 157 In scavenging lane at rear of K.I.L. 1563 In Jordan Road to K.M.L. 49

The number of drain connections was 215,

1923 Estimates, $30,000.00

1923 Sup. Vote, $13,000.00

$43,000.00

1923 Expenditure (from Government funds), $35,326.97

1923 Expenditure (contributions by various lessees), $701.26

$30,028.23

In conjunction with the Roads Office, a considerable number of new gullies was constructed and connected to the stormwater drainage system.

Page 630

Page 631

Share This Page