ANNEXE B,-Continued.

HEADS AND SUB-HEADS.

ESTIMATED.

ACTUAL.

PROVISION-

INCREASE. DECREASE. ALLY. BALANCE. EXCESS

VOTED.

Brought forward

Hongkong,-Continued.

Communications,—Continued.

21. Roads :-Continued.

(j) Victoria Road Improvement,... (k) Road from Western end of Robinson Road to Conduit Road,

$

C.

2,067,000 1,260,929.02

$

C.

C.

50,285.52 856,356.50 163,127.98 969,198.96

25,000 20,089.01

4,910.99

4,910.99

20,000

20,000.00

20,000.00

(1) Road from Wanchai Gap to Middle Gap,

20,000

12,761.04

7,238.96

7,238.96

(m) Road contouring billside above Conduit Road, 1st Section,

18,000

19,531.15

1,531.15

1,531.15

(2) Approach road to lots near Villa Miramere,

15,000

8,808.91

6,191.09

6,191.09

(o) Road 20 feet wide, skirting North side of bills, from Wanchai Gap to Magazine Gap,

(p) Road connecting Broadwood Road with Wongneichong Gap Road,

12,000

21,127.03

9,127.03

12,000.00

2,872.97

10,000

5,045.34

4,954.66

4,954.66

(4) Queen's Road East,-Widening to 60 feet,

10,000

22,938.87

12,938.87

20,000.00

7,061.13

(r) Kennedy Road,--Improvements,

10,000

9,926.46

73.54

73.54

(s) Extension of Broadwood Road to new motor road,........

7,500

4,399.38

3,100.62

3,100.62

(t) Road Improvements and Widenings, Miscellaneous :-

(1) Bonham Road,..

30,000

5,110.56

24,889.44

24,889.44

(2) Pokfulam Road between No. 11 Bridge and Aberdeen Dock,..

5,000

4,562.25

437.75

437.75

(3) Conduit Road,

30,000

14,178.09

15,821.91

15,821.91

(u) Main Roads in City,-Surfacing with asphaltum,

60,000

57,609.81

2,390.19

2,390.19

(v) Kennedy Town Praya,-Surfacing with setts and asphaltum to improve levels,

30,000

(w) General Works,

30,000

29,154.65

43,873.04

13,873.04

845.35

23,600.00

845.35

9,726.96

Drainage.

22. Training Nullahs :-- General Works,

10,000

8,502.67

1,497.33

6,000.00

7,497.33

23. Miscellaneous Drainage Works :-

(a) Extending existing outfall from below Wanchai Gap to the sea at a point near Aberdeen,

55,000

15,610.20

39,389.80

39,389.80

(b) Laying sewer in new road above the Colonial Cemetery,

10,000

12,882.60

2,882.60

5,000.00

2,117.40

(c) Installation of Drainage System at Repulse Bay,

6,000

(d) General Works,

25,000

2,760.91

33,836.40

3,239.09

8,836.40

3,239.09

16,858.38

8,021.98

Lighting.

24. Extensions of Lighting,.......

Miscellaneous.

25. Construction of reinforced concrete pier and superstructure opposite Queen's Statue,

26. Quarry, Workshop and plant,

Carried forward

1,500

1,437.50

62.50

800.00

862.50

97,000 96,487.54 70,000 22,879.74

-$ 2,674,000 1,734,442.17 99,474.61

512.46 10,000.00 10,512.46

47,120.26

47,120.26

1,039,032.44 258,917.51 | 1,198,475.34