P.W.E. Hongkong.
The number of drain connections made was 117.
1922 Estimates,........
1922 Sup. Vote,
..........................................$ 25,000.00 16,858.38
$ 41,858.38
1922 Expenditure (from
Government funds),... $33,836.40
1922 Expenditure (contri-
butions by various lessees),...........
13,664.60
-$ 47,501.00
In conjunction with the Roads Office, a considerable number of new gullies with flat gully gratings were constructed and connected to the storm-water drainage system.
1922 Estimates,
1922 Sup. Vote,
1922 Expenditure,
.$ 1,500.00 800.00
$ 2,300.00 1,437.50
Drawings were prepared for the structural steel roof and also for the facade to the Praya, which will consist of a carriage entrance with approaches flanked by a balustrade; tenders were called for the latter towards the end of the year.
1922 Estimates, ...$ 97,000.00 | Total Estimates, ...$127,000.00
1922 Sup. Vote, 10,000.00
1922 Expenditure,
$107,000.00 | Expenditure to
96,487.54 31/12/22,
109,857.98
9 Moulding tables for paving slabs with a total capacity
of 518 moulds,
1 Rotary Dryer and spiral mixer complete,
1 Revolving screen for 3″ stone,
P.W.E. Hongkong.
The number of drain connections made was 117.
1922 Estimates,........
1922 Sup. Vote,
..........................................$ 25,000.00 16,858.38
$ 41,858.38
1922 Expenditure (from
Government funds),... $33,836.40
1922 Expenditure (contri-
butions by various. lessees),...........
13,664.60
-$ 47,501.00
In conjunction with the Roads Office, a considerable number of new gullies with flat gully gratings were constructed and con- nected to the storm-water drainage system.
the
109. Extension of Lighting.—54 lamps were erected during year-35 Electric and 19 Gas.
1922 Estimates,
1922 Sup. Vote,
1922 Expenditure,
.$ 1,500.00 800.00
$ 2,300.00 1,437.50
110. Construction of re-inforced concrete Pier and super- structure opposite Queen's Statue.-This work was referred to in paragraph 116 of last year's Report. The actual pier was com- pleted by the end of the year with the exception of the depositing of the concrete to form the decking and a few very minor items of work.
Drawings were prepared for the structural steel roof and also for the facade to the Praya, which will consist of a carriage entrance with approaches flanked by a balustrade; tenders were called for the latter towards the end of the year.
1922 Estimates, ...$ 97,000.00 | Total Estimates, ...$127,000,00 1922 Sup. Vote, 10,000,00
1922 Expenditure,
$107,000.00 | Expenditure to
96,487.54 31/12/22,
109,857.98
111. Quarry Workshops and Flant.—To keep pace with the increasing demand on the Quarry for the various material manufac- tured there, the undermentioned additional plant was installed :---
9 Moulding tables for paving slabs with a total capacity
of 518 moulds,
1 Rotary Dryer and spiral mixer complete,
1 Revolving screen for 3′′ stone,