Q 67
P.W.E. Hongkong.
Connaught Road, between Cleverly Street and Hillier Street, was also surfaced, half the width on the South side with asphaltic sand carpeting 2" thick laid upon cement concrete foundation 6″ thick, and the Northern half with granite setts on cement concrete foundation 6" thick.
1922 Estimates....
1922 Expenditure,...
$ 60,000.00 57,609.81
(x.) Kennedy Town Praya.--Surfacing with setts and asphaltum to improve levels.-This work referred to in paragraph 182 of last year's Report was completed.
1922 Estimates,...
1922 Expenditure,.
30,000.00 29,154.65
(w.) General Works.--The following is a brief description of the principal works carried out under this heading :-
The low lying area, immediately South of the Cattle Depôt, Kennedy Town, was filled in to approved levels.
That section of the proposed road to Wongneichong Village, from Wongneichong Road to the Southern boundary of I.L. 2065, was formed, kerbed, channelled and macadamized, and granolithic paving laid to footway.
Consequent upon the erection of new buildings, kerbing and channelling operations were executed on the following roads, the footpath being paved and any necessary alterations in levels or alignment being effected :-
Catchick Street, Davis Street, Smithfield,
Praya West,
Wyndham Street,
Belchers Street,
Tai Hang,
Elgin Street,
Caine Road,
Queen's Road West, Graham Street. Shing Wong Street, M.L. 266 Praya West,
Kennedy Town,
North Street. Second Street,
Des Voeux Road Central, Whitfield,
Wongueichong Road. A.I.L. 89.
Shing On Street,
I. L. 2,322, North Point, S.I.Ls. 44, 471, 455, 457, 180,
476 and 485,
Connaught Road West, Cadogan Street,
Bowen Road from Military Hospital to Aqueduct.
1922 Estimates,.
1922 Sup. Vote,
1922 Expenditure,....
..$ 30,000.00 23,600.00
$ 53,600.00 43,873.04