277

P.W.E, Kowloon.

(xvii.) Taku Street-Kerbing, channelling and macadamizing carriageway (half width) on east side of H.H.I.L's 165 and 167, laying granolithic slabs to footways and paving scavenging lane,

(xviii.) Canton Road-south of Fife Street-Kerbing, channelling and macadamizing carriageway on the east side of K.I.L. 955,...

$300.10

289.92

Item (i). Consequent upon the linking up of the southern and northern portions of Nathan Road to admit of motor traffic, the section of road mentioned was put in order and tar-painted so as to afford an improved outlet for traffic to the New Territories.

Items (ii)-(xviii). All these items were rendered necessary by the erection of buildings on the various lots specified.

121. Training Nullahs,—General Works. The following is a statement of the works carried out under this heading

(i.) Extension of nullah in Nan Chang Street, Shamshuipo, from Hai Tan Street to Yee Kuk Street (incomplete),

Length trained. Lin. Ft. Expenditure. 200 $3,713.47

1918 Estimates, $5,000.00

1918 Sup. Vote, $7,500.00

$12,500.00

1918 Expenditure, $3,713.47

122. Miscellaneous Drainage Works.-The following is a statement of the principal items carried out under this heading, the amounts stated representing, in some cases, only a portion of the cost owing to the works extending into more than one year:

(i.) Extension of 6" sewer in lane between Changsha Street and Dundas Street, east of Shanghai Street, for K.I.L. 714 (completed),

$142.82

(ii.) Extension of 9" storm-water drain in Battery Street from Saigon Street to Pakhoi Street (completed),

$565.16

(iii.) Extension of 6" sewer from Pitt Street, in lane between Hamilton Street and Pitt Street, for K.I.L. 1174 (completed),

$224.03

(iv.) Extension of 6" sewer in lane between Hamilton Street and Pitt Street, west of Reclamation Street, for K.I.L. 1173 (completed),

$720.17

(v.) Extension of 15" sewer in Argyle Street from Coronation Road to opposite houses on K.F.L. 4 (completed),

$4,143.99