P.W.E. Hongkong.
Q 56
(ii) Matheson Street, Sharp Street East and Yiu Wah Street--Kerbing, channelling and surfacing Yiu Wah Street and laying granolithic slabs to footways around new houses on I.L. 730,
Deduct contribution by lessee of L.L. 730, $2,630.88 $972.03
(iv) Ship Street-Continuing steps upwards towards Kennedy Road and eastwards to Hau Fung Lane adjoining I.L. 2089, (v.) Forming path and steps adjoining G.L. 20, Conduit Road, to give access to I.L. 2205 (not completed), $1,658.85 $2,521.08 $2,430.85
(vi.) Royal Square-Laying granolithic slabs to adjacent footways, $2,383.47
(vii.) New path and steps between I.L's 61 and 768, south of Queen's Road East-Forming a flight of steps in extension of the work carried out last year,
(viii.) Mallory Street, Wanchai Road and Praya East-Raising footway in Wanchai Road, kerbing and channelling and paving with granolithic slabs around new houses on old M.L. 111 and surfacing remaining half of Mallory Street,...
(ix) Wing Hing Street, off Shaukiwan Road-Kerbing and channelling and paving footway with granolithic slabs and making up roadway in front of houses on I.L. 2166,
(x.) Western, First and Second Streets-Relaying kerbing, channelling and paving footways with granolithic slabs and surfacing scavenging lanes to houses on I.L's 625 and 626,
(xi.) Sutherland Street-Raising level of street, kerbing, channelling and laying granite setts,...
(xii.) S.I.L. 433-Kerbing, channelling and paving footways with granolithic slabs, forming roadway and surfacing scavenging lanes to houses on this lot,
(xiii) Wongneichong Road opposite Subordinate Officers' Quarters, Happy Valley, Relaying kerbing, forming channel, laying granolithic slabs, regulating level of carriageway and surfacing,
$2,036.34 $1,600.94 $1,466.99 $1,269.06 $1,216.83 $1,042.28 $978.86
(xiv.) Catchick and Belchers Streets---Completing road surfacing, &c., in front of new houses on I.L. 1297. $766.07