85
Hongkong.
from 15" to 9" in diameter, the combined lengths of which amounted to 1,944 feet, were also constructed. The total cost of the work was $4,517.74, which was defrayed from University funds.
KOWLOON.
148. Approach to Kowloon Railway Station.—The area immediately in front of the station and to the south of Salisbury Road was made up to the required levels and macadamised, the necessary kerbing, channelling and footways being also provided. The cost of the work, amounting to $2,024.08, was defrayed from Railway Votes.
149. Footpath to Rifle Range, King's Park.—The alignment of the path was improved and the surface was coated with tarred tops, cement concrete channels and catchpits being provided. The cost of the work, amounting to $1,113.67, was defrayed from Volunteer funds.
Staff, &c.
150. The following officer retired on pension on account of age, his pension being commuted as there were difficulties in the way of making arrangements for regular payment owing to his living up country.
Mr. Yip Sang, 5th Grade Foreman, pensioned on 1-5-16.
151. The following officers left the service of the Department during the year:—
Mr. L. O. Ross, Assistant Engineer.
Mr. S. H. H. Ixer, Assistant Engineer, resigned to go home and serve, with permission to rejoin again after the war is over.
Mr. H. Fawcett, Overseer.
Mr. C. W. Randall, do.
Mr. A. Gillan, Dredging Master, Dredger "St. Enoch".
Mr. A. Gray, Chief Engineer, Dredger, "St. Enoch".
Mr. C. McDonald, Apprentice Surveyor.
Mr. Yu Hoi Sang, 3rd Grade Clerk and Assistant.
Mr. Fok U-lun, Draughtsman.
Mr. Chan Cheuk-hoi, 5th Grade Clerk.
Mr. Pang Lai-shang, 6th Grade Clerk.
Mr. Tang Lock, Apprentice Surveyor.
Mr. Tsang Wai, Engineer, Dredger "St. Enoch".
Mr. Tong Chee, do.
Mr. Chan Sau, Boatswain, do.
Mr. Chan Sze, Quarter Master, do.
Mr. Leung Shing, Waterman, do.