Tai Po Quarters-General repairs and painting throughout and asphalting roof gutters, $975
Sheung Shui Police Station--General repairs and painting throughout, $879
Ping Shan Police Station-Do., do., $863
Cheung Chan Police Station---Do., do., $809
Tai O Police Station-Do., do., $789
Sha Tau Kok Police Station-Do., do., $596
Au Tau Police Station---Do., do., $507
Sha Tin Police Station-Do., do., and making good damage done by fire, $463 $42
42. Maintenance of Lighthouses.-The following sums were expended upon the various lighthouses:--
Waglan--External repairs, painting and colour-washing, also renewing the pipes for supplying oil to the burners, which was carried out by the Harbour Department at a cost of $631, $1,498
Cape Collinson-Reconstructing roof of Chinese Quarters in re-inforced concrete, $702
Gap Rock-External repairs, painting and colour-washing, $590
Green Island-Do., do., $337
43. Maintenance of Roads and Bridges in City.-The road surfaces were maintained generally in a satisfactory condition. The surfacing of the macadamized roads was considerably damaged by severe rainstorms in the beginning of June and July. The repairs were executed as far as possible out of this vote.
That portion of Lyttelton Road between the two lengths previously concreted, a distance of 870' 0" was surfaced with lime and cement concrete.
That portion of Robinson Road lying between Seymour and Upper Castle Roads was surfaced with fine cement concrete.
44. Maintenance of Roads and Bridges outside City.-The road surfaces generally were maintained in a satisfactory manner.
That portion of Shaukiwan Road skirting the Taikoo Shipyard was levelled up, channelled on the South side and coated with macadam.
A portion of the pitched slope on the North side of Causeway Bay Road was taken down and rebuilt.
The streets in the village of Tai Hang were repaired and provided with side channels where required.
45. Maintenance of Roads and Bridges in Kowloon.-The roads were maintained in good condition.
The road leading from Yaumati to Kowloon City was coated with macadam for a length of about 1,000 yards at the Yaumati end.