This agreed, the firm would be approached
denove at cokedt prepare
to prepare detailed plans. They would be told that of plans at estructed were approved they world be given
with in the figure
a percentage the job. Paymention a
of to total cost could be agreed
basis
Ynot
ü
offroved them the firm would be pard relation & work done as would be an archiket for the plas of building seven built.
Thefer of between 300 and 5.000 quries
Seems reasonable.
If decisions are not made
and
risk's not taken delayrull be interminable and nothing will be accompleated.
o
the techmeal side
A few comments which can be elaborated late frequired.
ques The formatation process goes through two Stages, the just aerobic the second anaerotic. As an must be available for the just
1.
2
the muxture
of pulverised
garbage stage and might soil must be sufficiently forous to alloro percolation fair forced auction
compacted!
Godden or
it must not become
from below maybe necessary (Report (p. 4) 3. faurora formatation takes plac
I considerable heat develops satisfactorily And much water is lost by evaporation. This water must be replaced on to muxture Willbecome too dry for the process continue satisfactorily. Overhead sprinklers will be essential.
4 The continuous flow method would ensure auration but would require a quest deal of power. — keeping even one day's
- supply of 100. Soo tons on
foo
to move would not
Howar
be cheap method word before thewon for making "Organs" by the Earp - Thomas digester resulted
deficient in nitrogen in a compat considerable quantites of ammonium sulfonate hand
so
Kat
18