1.

نه نه

APPENDIX A.

FINANCIAL SUMARY.

Administering Authority

Hong Kong Government.

Allocation.

Classification

3.

4.

Description of scheme

5.

Total cost

14

Hong Kong

Economic (Fisheries).

Mechanisation of Hong Kong

Fishing Fleet.

€20,000

6. Colonial Development and

Welfare Assistance required

7.

Estimate of assistance required

by Colony financial years.

Grant £20,000

Capital

Recurrent

1950 1950/51

£1,750

1951 1951/52

Total

817,350

$19, 100

(a) Personal

Emoluments

€450

€450

€900

(b)

Other Charges

Total Recurrent

£450

Total Expenditure

£2, 200

€450

€17,800

8.

Estimate of the total capital expenditure requir

made outside the Colony, showing separately:-

320,000

to be

(a) Iron and Steel

(b) Coment

(၁)

Nil

Nil

Machinery by main types, e.g. Industrial,

earth-moving, general agricultural locoaotlus, rolling stock, generating equipment etc.

2 Marine Diesel Enginus

2

Generators

2

Winches

Subject to verification when designs are co luted.

0.0/0 34/50

Share This Page