-27-

SECTION VI

ADDITIONAL RE-ESTABLISHMENT

REQUIREMENTS

62

55. GENERAL

An estimated sum of $50,000 is required for the rehabilition of Roads, Paths, Storm-water Drains and Path-lights; and of $30,000 for wood flooring in all class-rooms and offices on the first floor of the Main Building.

56. FACULTY OF MEDICINE

Further sums will be required for the following:-

a) Flooring in the Anatomy and Physiology Building: ...bout 850,000 (b) Further equipment for the Department of Pathology: About $10,000 c) Purther equipment for the Department of Anatomy: About $30,000

57.

FCULTY OF ENGINEERING

Further provision should be made for the following:

(a) Prime Movers Laboratory

Completion

8 5,000

Internal

Combustion Engine

Z 11,500

(b) Electrical Laboratory

Basic equipment

$ 3,000

Grid-controlled Arc Rectifier

$ 5,500

(d) Materials Laboratory

(e) suil Mechanics

(f) Ho Tung Workshop

58. FACULTY OF ARTS

---

(c) Applied Mechanics Laboratory Experimental

Apparatus

Strain-measuring

% 3,000

Apparatus Hydraulic Press

$ 3,500

$ 64,000

:

Apparatus

$16,000

Universal Cutter

and Grinder

$16,000

59.

A sum of $8,500 should be provided for Mathematical equipment.

FACULTY OF SCIENCE

Additional allocations for purchase of re-establishment

equipment are needed as under:-

(i) Department of Chemistry (ii) Department of Physics

about $100,000

about $50,000 - 75,000

60. JOURNALS

Back numbers of journals necessary to the prosecution of research are required, very roughly estimated to cost:-

(a) Mathematics:

(b)

Chemistry:

$22,500 $16,000

̈ ̈Section VII/

Share This Page