-27-
SECTION VI
ADDITIONAL RE-ESTABLISHMENT
REQUIREMENTS
62
55. GENERAL
An estimated sum of $50,000 is required for the rehabilition of Roads, Paths, Storm-water Drains and Path-lights; and of $30,000 for wood flooring in all class-rooms and offices on the first floor of the Main Building.
56. FACULTY OF MEDICINE
Further sums will be required for the following:-
a) Flooring in the Anatomy and Physiology Building: ...bout 850,000 (b) Further equipment for the Department of Pathology: About $10,000 c) Purther equipment for the Department of Anatomy: About $30,000
57.
FCULTY OF ENGINEERING
Further provision should be made for the following:
(a) Prime Movers Laboratory
Completion
8 5,000
Internal
Combustion Engine
Z 11,500
(b) Electrical Laboratory
Basic equipment
$ 3,000
Grid-controlled Arc Rectifier
$ 5,500
(d) Materials Laboratory
(e) suil Mechanics
(f) Ho Tung Workshop
58. FACULTY OF ARTS
---
(c) Applied Mechanics Laboratory Experimental
Apparatus
Strain-measuring
% 3,000
Apparatus Hydraulic Press
$ 3,500
$ 64,000
:
Apparatus
$16,000
Universal Cutter
and Grinder
$16,000
59.
A sum of $8,500 should be provided for Mathematical equipment.
FACULTY OF SCIENCE
Additional allocations for purchase of re-establishment
equipment are needed as under:-
(i) Department of Chemistry (ii) Department of Physics
about $100,000
about $50,000 - 75,000
60. JOURNALS
Back numbers of journals necessary to the prosecution of research are required, very roughly estimated to cost:-
(a) Mathematics:
(b)
Chemistry:
$22,500 $16,000
̈ ̈Section VII/