55.
GENERAL
-27-
SECTION VI
ADDITIONAL RE-ESTABLISHMENT
REQUIREMENTS
158
An estimated sum of $50,000 is required for the rehabilition of Roads, Paths, Storm-water Drains and Path-lights; and of $30,000 for wood flooring in all class-rooms and offices on the first floor of the Main Building.
56. FACULTY OF MEDICINE
Further sums will be required for the following:
About $50,000
a) Flooring in the Anatomy and Physiology Building:
Further equipment for the Department of Pathology: About $10,000 c) Further equipment for the Department of Anatomy: About $30,000
57. FICULTY OF ENGINEERING
Further provision should be made for the following:
(a) Prime Movers Laboratory
Completion Internal
$ 5,000
Combustion Engine
11,500
(b) Electrical Laboratory
Basic equipment Grid-controlled
$ 3,000
Arc Rectifier
$ 5,500
(c) Applied Mechanics Laboratory Experimental
Apparat is
£ 3,000
(a) Materials Laboratory
(e) Soil Mechanics
(f) Ho Tung Work shop
58.
Strain-mcasuring
Apparatus Hydraulic Press
Apparatus
· 3,500 64,000
$ 16,000
Universal Cutter
and Grinder.
$ 16,000
FACULTY OF ARTS
A sum of $8,500 should be provided for Mathematical equipment.
59. FACULTY OF SCIENCE
Additional allocations for purchase of re-establishment
equipment are needed as under:-
(i).
i) Department of Chemistry (ii) Department of Physics
60. JOURNALS
about $100,000
about $50,000-75,000
Back numbers of journals necessary to the prosecution of research are required, very roughly estimated to cost:-
(a) Mathematics: (b) Chemistry:
$22,500 $16,000
Section VII/
Page 160Page 161