SLEVIEL

BLOCK PLAN

LABORATORY.

THE

PEEL

ELECTRICAL

BASEMENT

FLOOR

PLAN.

SCALE: 8 FT to 1 inch.

SCALE

17. M

195.00

IL 1859

(0741)

(19018

tisT IN G

TINE

Paschp

YING

HYDRAULN

TIME

TOOT

PATH.

T

HA

105

POK FULAM

ROAD

[192-46)-

PROPOSED

INLAND LOT No 2610

ARCHITECTURAL &

ENGINEERING

UNIVERSITY

OF

HONGKING

*

BLDG.

2007-0

174

77145

67.95]

1854

167.30

TUNG

ENGINEERING

WORKSHOP

но

B. ARCA (L'Paul), A.R.1.B.A, Cl.

JSTA JANUARY

WAY

AND HALL

1949.

DWG N

ARCHITECTS. SURVEYORS 19

HONGKONG

12

Share This Page