(c)

3-

45

The building of the long projected Nurses Home (for which plans were drawn up before the war by the Tung Wah authorities). This would release a greater part of the present top floor of the hospital, now occupied by nurses, for the use of hospital patients.

In this way the hospital bed capacity could be increased from the present number of 226 to over 300. In addition certain other alterations would be necessary such as the provision of two extra operating theatres, a clinical laboratory, increased facilities for X-ray work, etc.

The total cost of all these improvements, for which tentative plans have been drawn up, and are available for inspection, would be in the region of H.K.$1,200,000.

Share This Page