HONG KONG WATERWORKS TABLE No. 8-PUMPING COSTS.
TYTAM TUK
POKFULAM ROAD
Pokfulam Reservoir
ALBANY
GARDEN ROAD
EASTERN
1927
1939 1946/7 1947/8
1939 1946/7 1947/8
1946/7 1947/8 1939 1946/7 1947/8
1939
1946/7 1947/8 1946/7 1947/8
Steam
Amount Pumped in Mill. Galls. Work done Water H.P. Hours.
1,304.61 1,590.71 1,099.17
933.57
215.65
1,920,000 1,707,570
www
260.42 274.83
1,038,950 986,610
Fuel Consump- Ition Total tons
4,460
3,580
2,704
2,198
1,830
2,247
2,205
Do. per WHP
Hour lbs.
3,114
2.885
4.86
5.01
Fuel cost per
WHP Hour.
Do. per M.G.
$46.00
$45.95
$0.21 $361.62
$0.158 $288.10
$153.98
$0.27 $1,058.46
$0.266 $954.50
Electric
Amount Pumped
in Mill. Galls.
Temp. Set
480.41
602.43
76.17
48.08
25.75
43.21
56.51
293.03
98.53
80.80
Work done Water
Power
Diesel
H.P. Hours.
Fuel Total
consumed in K.W.H.
K.W.H. per
WHP Hr.
Cost per
do.
Cost per
M.G.
Hydraulic Amount Pumped
in Mill. Galls.
Work done in
Water H.P. Hrs.
Power cost
per M.G.
¡Amount Pumped
in Mill. Galls.
Work done Water H.P. Hr.
Fuel Total
consumed
tons.
lbs. per
WHP Hr.
Cost per
do.
840,000 1,081,190
91,100 58,340
79,500 113,000
72,300
61,206
975.190 1,264,678
128,270
75,403
62,700
1.162
1.168
1.408
1.258
$0.11
$0.092
$0.24
$0.185
$0.13
113,696 150,689
1.428
1.333
$0.106
269,000
99,550
79,780
1.378
1.303
$0.13
$0.097
$193.60
$165.40
$285.10
$223.60
$73.14 $241.67 $211.50
$27.58
$93.89
$80.30
59.94
65.93
153,700 170,000
$5.13
$1.72
43.86
17.24
35.65
Temporary Fire Pump. (Petrol) 242.00
48,425
31,700
71,300
176,000
504.15
381,894
Cost per M.G.
Total Cost per M.G.
$61.30
$379.00
$333.50
Approx. Fuel Costs.
1927 1939
1946/7
1947/8
24.5
12.44
25.93
133.70
273.50
1.134
0.795
0.815
1.702
1.605
$0.103
$0.06
$0.072
$0.32
$0.239
$113.70
$114.73
$143.40
$1,335.00
$1,269.50 $406.00
$349.50
J
$356.00
$236.50
Coal per ton
Electricity per K.W.H.
$233.09 $180.45
$229.00 $176.80
Diesel per ton
$169.00
$172.70
J
$ 12.50
$ 19.95 $130.00
$120.00
$0.03
$0.09
$0.12
$140.00
$180.00
61