- 7 -
ca:trol of a fully trained Europe an.
(o) The latest tye blind lending equijermt.
(T) Elving Lon! Hou ditek »
(a) Four moorings to hold 100 tan ships.
(b) A mot of warping buoys at each pantogs.
(vi) intouroladeni wuf,munt.
4€
Adequate provision should be made in the terminal building for a fully equipped meteorological station capable of takinKET upper air readings, making weather forecasts, etc.
X
PRIORITY OF TRULYONIONS
1
If the Committee's report is adopted, it is
roomamnded that the reclamation of the area to the 8.1, of the present serodrme should be put in hand first, then the northern ares and finally the middle portion.
The
pletim of Azon "A" the H.3.- §.7. ruway (Tamway Ho.1) should be built. At the same time the complete terminal building and and hanger of the type reconunded should be apertad. other hangers can be budit ne funds and the docend for hangis® space pertit. The realing maways should be constructed as soon to the reola:mtion of Arons "3" and "0" is cupleted,
with regard to equipment, it is felt that researchı work should be corriended izasediately with a view to the installation (not necessarily at Kai Tak) of a modern dive©-- A properly tion finder which is not subject to night arEQU. trained staff water direct Kurosan supervision is essentiel for this work. betruetian lights should be placed on the
hills in the river racnawded :nd separate moûsın meteorological aquiyrant installed in the serodrome itself. Next in solar of trportanne core the coiling projector, the contral launch, me of the matrol immchen and a codorn
abulanse.
5. The Cowaittee would take this opportunity to plac
on record their appreciation of the services of Hr. F.C.K.