Sub-head 45.-Fo Pang Valley—S.W.D., $20,000. To provide storm-water drains
for this area and permit its development.
77
F
35
11
19
46.-R.C.C. decking to mullah at North-west of K.LL. 4240, Prince
Edward Road, $11,000.-To provide access to lots already sold.
47.—Anti-Malarial Works, $40,000.-To continue the programme
anti-malarial work.
PORT WORKS.
Sub-head 61.-Construction of seawalls and reclamation at Tsun Wan, $300,000.— To commence an extensive reclamation. Applications have already been received for land in this neighbourhood but it is considered desirable that the construction of the seawalls, the reclamation and the drainage, etc., be undertaken by Government.
62.-Refuse Boat Pier at Saigon Street, $10,000. The existing pier
inadequate for present day requirements and must be reconstructed.
of
""
48.-North Point-Reclamation Extension, $50,000.—To extend the seawall, and provide protection to the reclamation in course of construction.
49.-Kennedy Town-Construction of Seawall and Cattle Pier, $50,000.— To extend the seawall and provide protection to the reclamation in course of construction.
50.-Extension of Reclamation-Jubilee Street Pier to Pottinger Street Pier, $50,000.—To provide additional berthage for passenger ferries and extend the concourse at the Vehicular Ferry.
51.-Sand screening equipment, $15,000.-A re-vote to provide equip- ment for the proper grading of sand used in the making of concrete for Port Works.
52.-Sand Depot at Central Government Store, $10,404.-To complete the work now in hand and provide retention money on the contract.
53. French Street Refuse Boat Pier, $60,000.-Existing facilities at Eastern Street are inadequate. The construction of a new refuse pier is considered desirable.
54.-Government Slipway Yaumati—Reconstruction of Pier, $5,000.-
To meet cost of retention money on the contract.
55. Kun Tong Refuse Dump, $2,500. To meet cost of maintaining the
refuse dump.
56.-Nullah wall at Kun Tong, $150.000.-To commence the construc- tion of the first nullah side wall on this large reclamation and to give protection to the adjoining refuse dump.
57.-Kai Tak Airport-Nullah Diversion (first section), $239,880.—To continue the work now in hand which consists in the provision of new drainage to permit the use of the landing ground by heavy modern planes.
58.--Kai Tak Airport-Erection of Smoke Wind Indicator, $4,900.-- The indicator has now arrived and this sum is to cover the cost of its erection.
59.-Erection of Wind Recorder at Cheung Sha Wan, $600.-The wind recorder has been ordered from the United Kingdom and a hut is required to house it.
60. Cheung Sha Wan Extension of Reclamation, $200,000.-To con- tinue reclamation in this neighbourhood and provide the necessary drainage for lots already sold.
11
at
وو
MISCELLANEOUS.
63. Chinese Cemeteries-Laying out new areas, $70,000.-To continue
the provision of additional burial space.
64.-Colonial Cemetery-Laying out new areas, $2,000.-To extend the
burial space within the boundaries of the cemetery.
65.-Wongneichong Development, $55,000.-To provide for roads, sewers, and storm-water drains and thus enable areas to be sold. Many applications to purchase land in this district have already been received.
66.-Rewiring Government Buildings, $20,000.—To continue the rewiring
of Government buildings where necessary.
67.-Two supply tanks for street flushing, $1,800.—To meet the require-
ments of the Urban Council.
68.-Hammer Hill Urning Ground, $5,000.—To continue the opening
up of this area.
69.-Wo Hop Shek Cemetery, near Fanling, $70,000.-To complete the work now in hand which includes the construction of farewell pavilions, access road, quarters for staff, water supply and drainage.
70.-Extension of the Police Telephone from Ha Tsun Village, near Ping Shan Police Station, to Lau Fau Shan Village, on the coast of Deep Bay, $3,300.-To meet Police requirements in an isolated area.
71.-Recreation Grounds :--(a) Site A at Ma Tau Chung, $1,700.—To meet the cost of levelling areas for play- grounds for schools as required by the Director of Education.
(b) Site Cat Nullah Road, $7,000. To meet the cost of levelling areas for playgrounds for schools as required by the Director of Education.
72.-Compensation and Resumption, $35,000. To cover the cost of the resumption of private properties fronting on roads which require widening or realignment.