7

& you

696

было

bachs 2- Agrees

that construction

shovice be deferred will

bhung

8·11-39

ar tai kam

and I the

? copyrot' caps. ref 6. chart-aff-

рана и

asking for their Rosors.

:

inal hentia 14/12/29

wat

meting

5) indicates that the Consulting Engineers

be quite ready to take this on

? In writ; SCA as proposed say

there would be no

>

Objection to their

that

affroaching (a suitable form of Consulting

Engineer

in the matter.

Irizarré

14/12/39

Dracous

AY?

Binnia

Son.

the firm

firm who

han exterince of

H-HK

water projects

will no doubt and stake the

Tack

(as suspected

L

NOS-).

HK's

Photos in $3 879

38

wath supply is

Chronic problem

a gear xfervoi

hor

in the

They completel

The Thing Mun

New Temtring (

with the highest dam in the Empire) and hoped that for

Share This Page