329
56
Head 14. KOWLOON CANTON RAILWAY
Approved Estimate, 1939.
Estimate, 1940-41.
KOWLOON CANTON RAILWAY,—Continued.
Other Charges,—Continued.
明
Brought forward
813,296
728,726
Sub-heads :-
23 Signals and Switches.
E-5-6 Maintenance of Signals
1,850
2,200 (1)
Points and Crossings
2,500
4,400
(2)
"
4,350
6,600
24 Sleepers.
E-5-5-2 Sleepers
25 Stations Buildings and Staff Quarters,
30,000
33,750
(1)
30,000
33,750
E-5-7-2 Repairs, Stations and Building-
Maintenance of Turret Clock
5,000
5,600
(1)
340
425
E-5-7-3 Repairs, Staff Quarters
6,000
5,000
(1)
E-5-8
Repairs, Central Mechanical Works
1,700
1,500
(1)
13,040
12,525
26 Stores.
E-2-4-1 Stations...
3,500
3,000
(1)
E-3-1-5 Locomotives, Miscellaneous Stores...
5,000
4,375
(1)
E-3-2-3 Carriages and Wagons, Miscellaneous Stores
4,500
3,750
13,000
11,125
27 Telegraphs.
E-5-14-2 Maintenance of Telegraphs and Telephones
2,250
2,820
2,250
2,820
28 Tools and Plant.
E-4-8-1 Plant (Locomotive Workshops).
3.200
3,125 (1)
E-4-8-2 Tools (Locomotive Workshops)
1,700
1,750
E-5-9-1 Plant (Main. of Way and Structures). E-5-9-2 Tools (Main. of Way and Structures)
1,000
1,700 (3)
1,850
1,700
7,250
8,275
29 Transport.
E-1-7-4 Transport.
250
250
(1)
250
250
30 Tunnels.
E-5-3 Tunnels....................
31 Uniform,
E-1-7-6 Office Attendants and Messengers
550
375
(1)
550
375
270
300 (1)
E-1-11-3 Watchmen
E-2-3 Traffic Staff
E-3-1-1-4 Engine Staff
E-3-4-1-4 Train Staff
450
550
2,850
2,500
(4)
950
950
700
700
E-5-12-6 Engineering Staff..
32 Maintenance of Government Motor Vehicles
Running Expenses
Uniform for Motor Car Drivers
Unallocated Stores.
33 Purchase, Freight and Other Charges
$250,000
De duct Value of Stores to be issued to other sub-heads $250,000
175
150
(5)
5,395
5,150
7,000
8,750
175
300
(6)
7,175
9,050
Total Other Charges
Carried forward
472,678
896,556
340,119
818,646
(1) Considered sufficient.
(2) Heavy renewals of Switch Stand.
(3) New Hoist required (4) Less Staff.
(5) Allowance in lieu of uniform to Permanent Way
Overseer.
(6) Considered necessary.
Page 300Page 301