Forward

Circular on Column of

2350 ft Supe plain work

7

in Columns Straight @ 10 2800 ft Supe moulded work @ 2/9

92

base and Caps for

columns ruoulded and

worked Complete all materials and labour including fixing @ 50%. 168 feet run granite Stone Steps 12X6 urate Wedded in mustare fo 768 ft Supt. 4° grauite flagging laid Complete @ 8 1540 ft Supe marble tiled floors to Verandah bedded in mortar &

i

jointed in Chunam

Putty @ 1/4-

160 Squares roofing

Forward

2737. 2. 7

122, 10,

181.5.

385.

138.

10. 10.

25. 12.

102. 13. 4

3702.

12. 11

153

Share This Page