53

which shall be sent to the Canton-Hankow Railway or their

representative in Hong Kong.

Locomotive Repairs.

Repairs shall be carried out on instructions from

the driver or engine examiner.

Carriage Repairs.

Running gear repairs shall be carried out on instructions

from the carriage examiner.

Bodywork or interior repairs to be carried out on

instructions from the train conductor.

Such repairs with the necessary store issue notes will

be forwarded to the Canton-Hankow Railway or their '

representative in Hong Kong within 48 hours of completion of

the work.

Carriage Cleaning.

Stores and labour for carriage cleaning shall be

at a consolidated rate which shall be the subject of a

mutual agreement between the parties concerned.

6. The British and the Chinese Sections of the Canton-

Kowloon Railway shall pay $1.40 Hong Kong Currency per mile

to the Canton-Hankow Railway for locomotive hire, so long

as locomotive haulage be performed by the Canton-Hankow

Railway, but under conditions of locomotive failure on the

part of the former Section, the haulage performed by a

British or Chinese Section locomotive shall be the subject

of a credit in the haulage accounts submitted to the

Canton-Hankow Railway, at the same rate per mile.

7. In the event of a Canton-Hankow Railway engine

failure, the British and Chinese Section of the Canton

Kowloon Railway shall make such arrangements as may be

considered desirable in the best interests of traffic

operation, but normally in such circumstances a Chinese

Section Class C or Class D locomotive shall be considered

2.

Share This Page