APPENDIX_I
3050 ACRES.
FILTERED BUBBLY TO PORFULAM AREA
ACRES
FUTURE CATCHWATERS,
146 ACRES
3000
ACRES
ASREN
İNTAKE
DRINKERE
BAY
SHEK LAI mus
196 ACRES:
33-16 MILL GALLAN
a: mcters © M-4/0
5.0./ CONSTRUCTION
1.870 PROPOSED
COVERED SERVICE RESER
•PIRERS MILL
SERVICE KES.
́STONE CUTTERS ISLAND—
SERVICE RESERVOR....
PETERS
-JUBILEE RÉSERVOI
~3000 MILL GAL
GORGE DAM
NORTH CONDUIT
TOS ACRES
RIVER
405 ACRÉSÉ
„TIVAL BAS
CATCHWATER
RYEWASJÅRESERVOjk
T.W.LO 199,90 MILIJALL
HONG KONG WATER
-SERVICE
2-24" TRUNK MAINS
NEW TRUNK MAINS
Z-ZA” TRÚNK MAINS.
T.W.L. 284 CAPACITY
-YAU MATI SRAVICE REGERÝÐIR
T. W. Rith.00
5-438 HILL GALERE!
“Busting (Z” MAIN TO BE REPLACED
BY NEW MAIN
“16” MAINS TO BE PROTECTED
TRUNK MAIN (SECTION TO BE 18′′)
NAR
WEST POINT FILTERS
AND SERVICE KES.
1. PORFIMAM CONDUIT
COUNT REVIE
GARDEN TEAVEN
WPROVEMENTS TO ABERDEEN A
TUNNEL
NEW.TANI
425 ACRES_
ป
24 TRUNK MAIN
– NEW SERVICE RESERVOIR
»*» NEW BUMPING STATION
-NEW SUPPLY MAN
BOWEN ROAD
SERVICE RESERVOIR
TO BE EXTEN DOO
3. 4. FILTERS
TO BE TRANSFERKI-
ALBANY
SERVICE RESERVOIR AND FILTERS
*BOWEN ROAD
CONDUIT
TO BE RECONSTRUCTE
124 ACRES
179 ACRES
MAIN
ACRES
AREMDEN BAY
BRI ACRES
ABERDEEN MARTIA
UPPER REŠ. IWL. JAI.06m
173.23
EASTERN
FILTER B
10 14 EXTENSO I
SERVICE
RESERVOIR
TO BE EXTENDED
145 ACRES
ACRES
INTAKE
LITTLE
20 ACRES
ABERDEEN LOWER RES.
APLICHAN BUPPLY
LOWER PUMPING STATION
106-15 M. 0.
UPPER PUNTING STATION
AMERPEEN ISLAND
EAST
LAMMA
CHANNEL
MARY JOVETIN
BRICK HILL
H.BOLE
SCALE 2/2 INCHES = 1 MILE
WORKS
EXISTING WORKS AND CATCHMENT AREAS SHEWN IN GREEN
PROPOSED EXTENSIONS SHEWN IN RED
PROBABLE FUTURE EXTENSIONS SHEWN DOTTED IN RED
MAINLAND RESOURCES. SHING MUN VALLEY SHEWN thus :-
KOWLCON WATER WORKS
31
ISLAND
EASTERN
WESTERN
19
JJ
WONG NEI CHEONG
NEW
SERVIC
SREBRA VOLJ
MRAKKAR
TUKO DEN
KILL
AC
735 ACRES
225 ACRES
140 ACRIS
260 ACRES
ACRES
353
ACRES
LYEMUN
583
106 ACRESY
ACRES
210 ACRES
400
ACRES
LIK
170 ACRES
TUK
TY TAN BAY
PASS
29