2.

from various sources seem to show that the Kwangtung

section also requires much renovation, and that the

intermediate section now under construction is unlike-

ly to be in full running order until some considerable

time after the official opening of the whole line.

I have the honour to be,

With the highest respect,

Sir,

Your most obedient,

humble Servant,

(SIGNED) D.J. COWAN.

In the absence of H.M. Chargé d'Affaires.

13

Share This Page