Works.

Appendix VI (a)

LOAN WORKS.

Authorised under Public Works Loan, 1927—$5,000,000.

Works.

HEAD 1.-WATER WORKS DEVELOPMENT.

(a) Shing Mun Valley Scheme,

HEAD 2-AERODROME AND HARBOUR DEVELOPMENT. (a) Harbour Development.. (b) Aerodrome..

Total

Total Cost.

Amount charged to Public Works Loan 1927.

Amount tempo- rarily charged to Surplus Balances.

4,136,765.59

3,500,000.00

636,765.59

474,854.63

1,045,631.29

474,854.63 1,025,145.37

20,485.92

5,657,251.51

5,000,000.00

*657,251.51

* Transferred to 34% Dollar Loan, 1934. Appendix VI (b).

Appendix VI (b)

LOAN WORKS

Authorised under 31% Dollar Loan, 1934–$25,000,000.

117

Revised Estimated Cost.

Expenditure up to

Revised Estimated

Estimated

31. 12. 35.

Expenditure Expenditure

1937.

Estimated Expenditure 1938.

Estimated Expenditure 1939.

1936.

HEAD-1. ABERDEEN VALLEY WATER SCHEMET

2. SHING MUN VALLEY WATER SCHEMES

(a) 1st Section†.

2,555,702.78

2,555,702.78

:

626,705.59*

(b) 2nd Section:

(1) Preliminary Workst.

(2) Filterst

36,718.84 120,015.23

(3) Gorge Dam

8,325,000.00

(4) 2nd Cross Harbour Pipel

173,348.32

636,765.59

36,718.84 120,045.23 6,023,127.03 173,348.32

2,000,000.00

301,872.97

2nd 24" Trunk Main

350,000.00

300,000,00

50,000.00

(6) 3rd Rapid Gravity Filters

300,000.00

9,941,877.98

250,000.00

50,000.00

3. VEHICULAR FERRY

4. NEW GAOL AT STANLEY

5. TYTAM TUK CATCHWATERS

6. AIRPORT:-

(a) Aerodromet

(b) Airport and Seaplane Slipway

(c) Wireless Telegraph Station

7. REDEMPTION OF 31% INSCRIBED STOCKT.

8. CENTRAL MARKET

1,930,000.00 1,867,977.51

4,400,000.00

700,000.00

62,022.49

1,450,711.32

044,368.44

2,600,000.00

349,288.68

55,631.56

20,485.92*

20,485.92

860,000.00

583,931.92

214,068.00

127,000.00

1,007,485.02

64,172.79

62,000,08 62,827.21

3,804,942.97 3,864,942.97

550,000.00

200,000.00

350,000.00

9. PUBLIC WORKS (UNALLOCATED)

49,990.35

49,990.35

TOTAL...

25,000,000.00 18,042,298.66 5,481,722.05

13,860,000.00 13,860,000,00

1,075,988.94

399,990.35

Expenditure charged to 33% Dollar Loan (First Issue)..

Expenditure temporarily charged or to be charged to

Surplus Balances pending Second Issue of Bonds...

† Completed.

11,140,000.00

4,182,298.66 5,481,722.05

1,075,988.94

399,990.35

* Transferred from Appendix VI (a).

196