Main Traverse.-The following new traverses were run :

Locality.

St. 29 near Upper Peak Tram-

Peak Road-May Road-Brewin Path Trig.

Length Angular Linear

in ft. Misclose. Misclose.

6,310

17" 1 in 6090

St. 7 Repulse Bay to St. 24 Stanley

Gap

5,537

14′′ 1 in 8260

St. 24 Stanley Gap to Stanley

Police Station

5,412

14" 1 in 6410

Wanchai Gap to Aberdeen

10,000

1′20′′

1 in 11000

St. 5 in main traverse No. 21 to St.

3 in main traverse No. 1

12,100

30" 1 in 26630

St. 16 in main traverse No. 15 to St. 5 in main traverse No. 21 ....

St. 5 in main traverse No. 21 to St. 16 in main traverse No. 15...

19,311

1'14" 1 in 10600

7,385

50" 1 in 8500

·

St. 7 in main traverse No. 22 to

Tates Cairn (Trig.)...

10,950

2′00′′ 1 in 9950

Tates Cairn Trig. to St. 14 in main

traverse No. 17

13,600

2′00′′ 1 in 9000

St. 62 in main traverse No. 16 to

40"

1 in 12400

St. 24 in main traverse No. 16... 13,082

In addition, six minor traverses were run, the errors being well within the prescribed limits.

GENERAL.

1

29. Nineteen Colony Sheets and thirty two

600

1

were

2400

1 sheet No. 19

taken up during the period under review. The 20000

1

(map of Hong Kong and Kowloon) was corrected and the 10000

"Victoria" brought up to date. Various small surveys were made and plans prepared for the Police Department in connection with criminal cases. The annual perambulation of the Sino-British boundary was made for the inspection of boundary marks.

LEVELLING.

30. Considerable progress has been made with the levelling of the Colony, which, with the exception of a few short lines in outlying districts, has been completed. A detailed report with value of all bench marks is now in course of preparation. The following tabulated statement shows some of the work done during the year: