ecolies employed at the filter beds. were laid in Kiu Kiang Street. was installed between the Self Gravity Filtration House.

Expenditure

198 feet of 6" cast iron main An electric alarm bell circuit Closing Valve and the Rapid

$2,844.10

184. Port Works.Expenditure under this head was for the erection of turnstiles and an electric clock at Sham Shui Po Ferry Pier, notice boards and an oil lamp at Laichikok Water Boat Dock, and other minor works.

Expenditure

COMMUNICATIONS.

$472.44

185. Taipo Road adjoining Castle Peak Road: Improvements. -The Contract for the improvements to Taipo Road at its june- tion with Castle Peak Road was awarded to Messrs. Hop Hing & Son on 11th May, 1988, and the work was satisfactorily com- pleted by the end of the year. In connection with this work the 18 cast iron trunk water main from Kowloon Slow Sand Filters was relaid along the new portion of the road for a length of 2,075 1,400 feet of the old main were recovered by the end of

feet. the year.

Expenditure

$14,806.88

186. Improving existing main roads for motor traffic.-Only minor works were carried out under this heading.

Q 47

191. Reconstruction of Kowloon City Wall.-No work was done under this head during the year.

Expenditure

Nil.

192. Kowloon Tong Recreation Ground.-A portion of ground in Rutland Quadrant was levelled, turfed and equipped for use as a children's playground. A re-inforced concrete shelter with lavatories attached was erected. The Contract was awarded to Messrs. Nam Hing Co. on 3rd August, 1933, and the work was satisfactorily completed by the end of the year.

Expenditure

$6,663.78

193. Kowloon Tsai Garden City Development (1st Section). -A contract amounting to $138,761.50 was let in March and work commenced immediately. By the end of the year 469,288 cubic yards of excavation had been removed, and the construction of the western side of the nullah in Waterloo Road had been completed. Minor storm-water drainage work was also executed.

Expenditure

$68,193.64

Expenditure

MISCELLANEOUS.

$1,112.18

187. Chinese Cemeteries: Laying out new areas.-Reference has been made to this work in paragraph 31 of this Report.

Expenditure

$1,778.97

188. Exhumation from Chinese Cemeteries.-No exhuma- tions were carried out during 1933.

Expenditure

Nil.

189. Refuse Dump at Cheung Sha Wan.-This work was referred to in paragraph 160 of last year's Report. A new con- tract was let to Messrs. Chung Lee & Co. in April and satisfactory progress was maintained during the year.

1933 Expenditure.....

$5,257.57

Expenditure to 31st Dec., 1933...... $13,568.98

190. Sham Shui Po (N.IV. Camp Area) Nullah Improve- ments. The piling, foundations, and invert of this nullah at Cheung Sha Wan were completed by the end of December,

$8,137.15

Expenditure

WATER WORKS.

194. Back Lane Service Pipes.-4,204 feet of 1" to 3" diameter wrought iron piping were laid as subsidiary mains in back lanes. 401 houses were connected to these mains during the year.

Expenditure

$6,354.02

195. Distributing Water Mains.-The following work was carried out under this head:-1,250 feet of 12" cast iron main were laid in Cheung Sha Wan Road, 160 feet of 10′′ cast iron main in Boundary Street, 855 feet of 8′′ cast iron main in Grampian Road, 450 feet of 6" cast iron main in Nga Tsin Lung Road, 380 feet of 6" cast iron main in Shek Ku Lung Road, 220 feet of 6" cast iron main in Carpenter Road, 180 feet of 6" cast iron main in Nga Tsin Wai Road, 150 feet of 6′′ cast iron main in Shek Kip Mi Street. 390 feet of 12" cast iron main were taken up in Cheung Sha Wan Road.

Expenditure

NEW TERRITORIES.

BUILDINGS.

$19,154.99

196. Market and Reclamation, Tsun Wan.-It was not pos- sible to do any work under this head as the necessary resumptions of land had not been completed.

Expenditure

Nil.