444

6

The extension to Sun Wai Camp area was set out and centre lines of various roads in the New Territories.

25. The frontage lines to streets of 335 lots were checked.

26. 3,592 stones were fixed to define the boundaries of 917 lots.

27. Boundaries of numerous lots and street alignments were set out for the Drainage, General Works and Roads sub- departments.

SURVEY OF COLONY,

28. The following tabulated statement shows the work done under this heading :

City of Victoria

North Point.

Stanley

Repulse Bay

Area surveyed Area plotted Chainage

1

Main Traverse.-The following new traverses were run :

45

Locality.

St. 29 near Upper Peak Tram-

Wanchai Gap to Aberdeen

St. 5 in main traverse No. 21 to St.

3 in main traverse No. 1

Length Angular Linear

in ft. Misclose, Misclose.

Peak Road-May Road-Brewin Path Trig.

6,310

17" 1 in 6090

St. 7 Repulse Bay to St. 24 Stanley

Gap

5,537

14"

1 in 8260

St. 24 Stanley Gap to Stanley

Police Station

5,412

10,000

14" 1 in 6410

1′20′′ 1 in 11000

12,100

30" 1 in 26630

St. 16 in main traverse No. 15 to

St. 5 in main traverse No. 21

St. 5 in main traverse No. 21 to St. 16 in main traverse. No. 15... St. 7 in main traverse No. 22 to

Tates Cairn (Trig.)..

19,311

1'14" 1 in 10600

7,385

50′′

1 in 8500

10,950

2'00"

1 in 9950

Tates Cairn Trig. to St. 14 in main

traverse No. 17

13,600

2′00′′ 1 in 9000

Tytam Gap

3.89

3.89

17,020

Tai Hang

.09

.09

1,040

Wong Nei Cheong

2.30

2.24

2,380

Shek O

5.63

5.63

13,968

St. 62 in main traverse No. 16 to

St. 24 in main traverse No. 16... 13,082

40" 1 in 12400

In addition, six minor traverses were run, the errors being well within the prescribed limits.

Wong Nei Cheong Gap ...

1.01

1.01

1,700

Shaukiwan

6.07

6.07

4,474

Kai Lung Wan

10.00

10.00

Aberdeen Waterworks

2.04

2.04

8,228

Mount Cameron.....

1.70

1.32

Kowloon

117.00

117.00

2,447 49,400

New Kowloon......

414.00

414.00

313,193

Revision work was also carried out as follows:-

City of Victoria

6.82

6.62

16,177

Repulse Bay

2.38

2.32

4,332

Shek O

8.26

8.26

2,200

Stanley

.44

.44

New Kowloon

57.00

57.00

946

21,100

The surveys mentioned in paragraph No. 22 were also plotted on the Colony Sheets.

1 taken up during the period under review. The

20000 (map of Hong Kong and Kowloon) was corrected and the "Victoria", brought up to date. Various small surveys were made and plans prepared for the Police Department in connection with criminal cases. The annual perambulation of the Sino-British boundary was made for the inspection of boundary marks.

LEVELLING.

30. Considerable progress has been made with the levelling of the Colony, which, with the exception of a few short lines in outlying districts, has been completed. A detailed report with value of all bench marks is now in course of preparation. The following tabulated statement shows some of the work done during the year:

GENERAL.

I

29. Nineteen Colony Sheets and thirty two

600

1

2400

sheet No. 19

were

10000

Share This Page