INSIDE SHEET.
Indent No*
date*
To CoreSend with No.
and d
head of first sho
Iter No
Quantity.
HONG KONG
Page
Description of articles.
ESTIMATED COST IN ENGLAND
Total.
Remarks.
Rate. £.
S.
d.
13. (Cont'd)
14.
15.
b.18 Resistance Units as used
on Receiver.
c.1 set Windings Attenuator.
d.2 Grid Leaks.
6.2 High Frequency Chokes.
f.2 Low Frequency Chokes.
g.4 Low Frequency Transformers.
h.1 Potentiometer.
1 Bet. SPARES for Rectifier Rack
comprising:-
a.1 Metal Oxide Rectifier
Unit of each type.
b. 4 Condenser Units.
c.2 Chokes.
PORTABLE FIELD-STRENGTH MEASURING EQUIPMENT, for field work.
(See Accompanying letter)
Hotsi me complete equipment to be
in tropical finish and in accordance with Preece, Cardew & Rider's Specification Mo. ZA/10A.
The foregoing Schedule is submitted as an indication of the arrangement proposed but the Installation may differ in minor respecte with the object of improving the working.
Approx... ¡EROK
The indent should be prepared in conformity with the "Notes respecting the preparation of indents" which companied the Crown Agents' letter No. E/207/39 of the Ist August 1916. The list of articles should be written on e side of the paper only. Specifications or explanatory notes which cannot be put in the margin should be written
separate sheets and referred to in the indent.
15