ress? Binnie Son Deacon have reachid
the conclusion that a different type of dam is required constructed tainly of concrete as a massning dann would be expensive
costly than originally
mone
estimated
no reason to suppose
that the cost of the damn will exceed
down
They have
this orginal
estimate
ov
that
a
Juln.
longer time than ongmally anticipated
required
wired for it's construction.
will be r
Jonson syp
his
пиний
smpneshack
when
je
went in
laus.
Copy unit.
Litingen.
Balan
28/8/33
9 to K. Kong
-342. (We encl.)
b8
/
5 SEP 1933