ress? Binnie Son Deacon have reachid

the conclusion that a different type of dam is required constructed tainly of concrete as a massning dann would be expensive

costly than originally

mone

estimated

no reason to suppose

that the cost of the damn will exceed

down

They have

this orginal

estimate

ov

that

a

Juln.

longer time than ongmally anticipated

required

wired for it's construction.

will be r

Jonson syp

his

пиний

smpneshack

when

je

went in

laus.

Copy unit.

Litingen.

Balan

28/8/33

9 to K. Kong

-342. (We encl.)

b8

/

5 SEP 1933

Share This Page