3

in (2). Exceeds the Estimats ($ 185.200 - $179.000)

v.

Rovision

of offices and

filungs

us in para 3 of Enchi2 to 3 = c. Change in Wunding gras for ramps strengthening of fundering of purs

9

4. Repairs of damage to piers in Early staps of Semence

Cost of improcments the??

by M. Kneller (Superintendang C.

to

$

6.200

16.800

26.000.

12.000.

IM Naval Yard Hong Kong: 124000

End 2 to 3).

5 of End 2

Engines

(as in pasa

Total

$ 185.000

? Dispatch conversing covering authority for expenditions of $139.000 in respect of 1933 for Expands 9 $139.000 in 1934 and approval of crored Estimate of $1.864.0 It appears that some

to the

mreased Estimate

Your vise

A

forsun

Wha

work

for thes

? Should

q

tre trens which

neussit for this

could have been

the original Estimate

was preferred.

tus circumstance be

mentioned in

the despatch.

HE. Bader

23.1.34.

drit

think

we need mention

A. hat

Ish" like to se

The Est" papers in whiche

Share This Page