311

78

Head 26. KOWLOON CANTON RAILWAY

Approved Estimate, 1982.

Estimate, 1933.

KOWLOON CANTON RAILWAY,-Continued.

Other Charges,—Continued.

Brought forward

691,538

715,760

Head 26. KOWLOON CANTON RAILWAY

Approved Estimate, 1982,

Estimate, 1938.

KOWLOON CANTON RAILWAY,—Continued.

Sub-heads:-

Other Charges,-Continued.

Brought forward

$

$

774,973

804,435

79

Sub-heads :-

12 Incidental Expenses.

E-1-5-3 Stores

24 Signals and Switches.

200

200

E-1-6

Head Office

1,000

850

E-5-6

Maintenance of Signals Points and Crossings

E-2-8-4 Traffic Office

150

1,100

1,100

1,500

1,500

2,600

2,600

E-5-1-3 Maintenance of Way and Structures.-

150

150

25 Sleepers.

1,350

1,350

13 Locomotive Repairs.

E-5-5-2 Sleepers

40,000

40,000

E-4-2-1 Materials for Repairs and Renewals

Painting Contract

36,000

1,638

36,000 1,638

40,000

40,000

26 Stations Buildings and Staff Quarters,

37,638

37,638

14 Lubricants.

E-5-7-2 Repairs, Stations and Buildings.

8,712

5,500

(1)

E-3-1-4 Locomotive Oil.

14,500

20,000

(1)

Maintenance of Turret Clock

340

340

**

E-3-2-2 Carriages and Wagons, Oil

1.500

1,500

E-5-7-3 Repairs, Staff Quarters

3,000

3,000

E-3-3-2 Oil Fuel for Motor Coaches

6,500

5,500

(2)

7,052

8,840

22,500

27,000

27 Stores.

15 Medical and Sanitation.

1.

E-1-9-2 First aid Bandages, up-keep of Ambulance Boxes,

etc. on trains

Railway Cups for Efficiency in First Aid..........

16. Minor Works (Maintenance of Way and Structures).

E-2-4-1 Stations....

4,000

4,000

200

75

200 75

E-3-1-5 Locomotives, Miscellaneous Stores... E-3-2-3 Carriages und Wagons, Miscellaneous Stores

6,000

6,000

4,500

4,500

275

275

14,500

14,500

28 Telegraphs.

E-5-11 New Minor Works

2,000

2,000

E-5-12-6 Minor Repairs

150

150

E-5-14-2 Maintenance of Telegraphis and Telephones

2,250

2,250

2,150

2,150

2,250

2,250

29 Tools and Plant,

17 Miscellaneous.

E-1-16 Prizes for Best kept length of Line E-1-1-3 Stores Depreciation..

24

24

100

100

E-4-8-1 Plaut (Workshops)

4,000

1,000

124

124

E-4-8-2 Tools (Workshops)

1,500

1,500

18 Nightsoil Disposal.

E-2-2-3 Nightsoil Disposal

264

264

E-5-9-1 Plant (Main. of Way and Structures). E-5-9-2 Tools (Main. of Way and Structures)

500

500

1,850

1,850

264

264

7,850

7,850

19 Plantations,

E-5-12-4 Plantations.

30 Transport.

146

146

146

146

E-1-7-4 Transport

20 Power, Electric Fans and Light.

400

400

400

400

E-1-5-3 Stores

115

1.15

31 Tunnels.

E-1-6 Head Office

1,000

1,000

E-2-4-1 Stations

1,150

1,690

E-5-3

Tunnels..

E-4-9 Central Mechanical Works....

6,500

6,500

500

500

500

500

E-5-14-2 Maintenance of Fans and Light

1,000

1,200

32 Uniform.

9.765

10,505 (3)

21 Printing and Stationery.

E-1--3 Stores

60

60

E-1-7-6 Uniform for 6 Stores Watchmen, 1 Office

Attendant and I Messenger

450

420

E-1-6

Head Office

540

540

E-2-3

Station and Train Staff

5,150

4,825

E-2-3

Printing, Stationery and Tickets

2,400

2,400

Uniform for 7 Watchmen

500

475

+

E-3-1-1-4 Running Expenses

200

200

E-8-1-1-4 Uniform for Drivers, Firemen, Pointsmen...

780

680

(2)

E-5-1-3 Maintenance of Way and Structures

300

300

E-4-11-3 Uniform for Watchinen

670

630

3,500

3,500

E-5-12-6 Uniform for 5 Watchmen and 3 Sub-Inspectors...

500

470

22 Rails and Fastenings.

8,000

7,500(2)

E-5-5-3 Fastenings

1,500

1,500

-33 Motor Cars and Lorries, Running Expenses (3)

8,000

8,000

Rails

13

1,000

1,000

8,000

8,000

2,500

2,500

28 Rents.

Total Other Charges

E-1-13 Rent of Shum Chun Station

3,223

3,223

3,228

3,228

Carried forward

468,709

866,125

466,574

896,875

Carried forward

774,973

804.435

(1) More repairs to workshops.

(2) Considered sufficient.

(8) Government cars and lorries on mainland maintained by

Kowloon Canton Railway.

(1) Increased prices.

(2) Considered sufficient.

(6) More consumption and maintenance due to outstations

being wired.

312

Share This Page