Item
WORKS
Estimate
Approved Supple- Est.1933. mentary
Total Est. Est.1933 1933
$
$
$
$
KOWLOON
Buildings (Cont'd.)
Kowloon Hospital Outpatients
Department
General Works
65
Drainage:-
114,000
Remarks.
30,000 30,000
The present arrangements are inadequate to deal efficiently with the greatly increased outpatient work at this hospital. This will provide for the commencement of a separate block for outpatients.
Misc: Drainage Works
Water Works
100,000
30,000 130,000
82
Distribution Circuit from
180,000 30,000
New Reservoir,
75,000 | 105,000
Yaumati Hill
NEW KOWLOON
Port Works
Construction of Rubble Mound
Kun Tong 1st Section
NEW TERRITORIES
Communications
Resurfacing, Shatin Causeway
Taipo Road.
50,000
50,000
50,000
70,000 70,000
To allow for the more expeditious completion of drainage works mostly in connection with nullah training.
To enable the earlier completion of the distributing circuit which will provide a more equal pressure of water in Kowloon Point district.
To provide by reclamation a site for the dumping of city refuse and harbour dredgings. C.S.0.3042/24.
To strengthen and recondition road surfacing, also to repair defective stone pitching at Shatin Causeway. Necessary in view of increased motor traffic.
155