Enclosure No. 3.
5
Buestions for consideration by Crown Agents when drawing up a feement with Consulting Engineers.
Consulting Engineers to advise upon design and to supervise the Construction of the Works in connection with the erection of a Dam at the Shing kun Gorge.
2. Consulting Engineers to prepare all necessary Designs, Detail Drawings, Specifications, Bills of quantities,
Schedules and any other particulars to enable the said Dan
to be carried out at the earliest possible date.
Consulting Engineers to be free to carry out the Works by Contract, Sub Contract or Direct Labour subject to permission from Hong Kong Government after particulars have been submitted.
4. The Consulting Engineers shall supply the Government with two copies (prints) of the General Drawings for the Works before work is commenced and on completion shall furnish two copies of drawings of the Works as carried out showing foundations, drainage etc. with finished levels.
5. Any alterations or additions to the Works which may alter the Estimated Cost or alter the general nature of the Structure should first be submitted to the Colonial Government
before being carried out.
6. Fees and mode and time of payment to be stated. Period of Consulting Engineers Contract with Government to be set, say, five years. Notice to be given six months before expiry and if any extension necessary to be by further mutual agreement.
7. One of the Consulting Engineers to visit the Works once in every year during the Construction of the Works.
8. Dispute or difference arising over the Works between Government or Consulting Engineers and Contractors or Sub Contractors, Consulting Engineers to be Arbitrators without extra fee.
9.