- 3 -
47
advisable to assume at present that the water was raised by
the Dam above 615 0.D.
It would be feasible to adopt the highest level
of 625 0.D. but further works would be involved the extent
of which cannot at present be determined, but it is not
anticipated that these would be of any great magnitude and
would be covered by the estimate given in our previous
report.
In this report, paragraph 64 and 65, two alternative
methods of carrying out the work are dealt with and we would
recommend that the work be carried out by administration,
Sub-contracts being let for various portions of the work
wherever possible.
If there are any other points with
which you wish Mr. Binnie to deal, he would be pleased to do
so by interview.
We have the honour to be,
Sir,
Your obedient servants,
(sd.) Alex. Binnie Son & Deacon.