5

6 6A

9/4

that the

Ins. a copy of Mor Gourley report.

with obsons.

Recommend

Consulting Engineers should be

with the dengn of

entrusted

the dam

and should

upon to

be

Called

accept full responsibiltyg

for it's stability.

The report is

R

whole farewell

Ma

to Ms. Henderson's scheme, but in vivo o

pam 42

sand the doubt expressed in

as

to the foundation caritimo oth propsand dam site, we cons дартный

pority appower the schem at proud.

My Handwom ustimato that My Jobs

wood constructin

works wats

рит put it

र्थ

12 Dam and

subsidiary

Jul.E.

ast $4750000. Du l.E

$8,000,000 for the dam

and $3500000 for the catchwaters

The supprotin thas M. Binnin

Furnel.

should visit

aufuum fume

as further repor

fond

oft for coron 4/s.

Justibl

ん 久

नियाम

I have somewhat amplified the draft. Mer feeston toace afterwards. J. A. Calder.

17·4-31

Share This Page