5
6 6A
9/4
that the
Ins. a copy of Mor Gourley report.
with obsons.
Recommend
Consulting Engineers should be
with the dengn of
entrusted
the dam
and should
upon to
be
Called
accept full responsibiltyg
for it's stability.
The report is
R
whole farewell
Ma
to Ms. Henderson's scheme, but in vivo o
pam 42
sand the doubt expressed in
as
to the foundation caritimo oth propsand dam site, we cons дартный
pority appower the schem at proud.
My Handwom ustimato that My Jobs
wood constructin
works wats
рит put it
र्थ
ว
12 Dam and
subsidiary
Jul.E.
ast $4750000. Du l.E
$8,000,000 for the dam
and $3500000 for the catchwaters
The supprotin thas M. Binnin
Furnel.
should visit
aufuum fume
as further repor
fond
oft for coron 4/s.
Justibl
ん 久
नियाम
I have somewhat amplified the draft. Mer feeston toace afterwards. J. A. Calder.
17·4-31