125

Brought forward............$ Owing to the fall in exchange the cost in local currency of stores already ordered exceeded the estimate by $14,584.95 thereby exhausting the vote.

It is estimated that a further sum of $10,000 will be necessary to cover the cost of stores required up to the end of 1931.

The above is to be met from savings under Provisions for patients (1931 Estimates page 54 sub-head 20). (C.S.O. 15 in 173/31).

48.-31, Public Works Extraordinary:-29, Hong Kong Port Works, Ferry Piers (Western). To complete work commenced in 1930

Provision made in Estimates (page 94 sub-head 29)...S A sum of $40,000 was provided in 1930 (Head 31, sub-head 39, page 85) and $20,000 in the current Estimates

The first instalment of the work, Contract value $34,200, and comprising the construction of a reinforced concrete structure was due to be com- pleted on 11th November, 1930. The value of work actually completed at end of year amounted to $18,360 leaving an unexpended balance on 1930 Vote amounting to

$21,640

The second instalment of the work, valued $26,800 cousists of the erection of a steel bridge to span the space between the shore and reinforced con- crete structure.

Revised estimated total cost of work

Deduct liquidated damages for failure to

complete 1st instalment of work on contract time

Expenditure to 31.12.30

Amount provided in 1931 Estimates

$

71,651.74

12,600.00

20,000

60,000

- 5

Brought forward....

In order to provide weather protection to the General Public in con- nection with the Traffic Improvements at the Traffic Circus, Tsim Tsa Tsui, it is proposed to provide the following covered ways namely:-

a) Ferry Wharf to Taxi Stand

1,800 1,200

(6) Ferry Wharf to Public Pier

Total estimated cost

3,000

The above is to be met from savings under Kowloon British School site (1931 Estimates page 94 sub-head 39). (C.S.O, 1415/20 P. II).

* 51-31, Public Works Extraordinary :-54, Mong Kok Tsui Ferry Pier. To complete construction

Provision made in Estimates (page 94 sub-head 54)...$ 15,000

Original Estimate

$ 135,317

Revised Estimate

$ 141,883

Work completed to 31.12.29.

.$ 20,217

Work completed to 31.12.30.

98,578

Provision made in 1931 Provision to be made in 1932

15,000

Nil.

133,795

Amount now required to complete

8,088

Amount underestimated due to increased

cost of materials

$ 6,566

Balance unexpended not provided in 1931

Estimates, now requested for revote...

1,522

8,088

.$ 107,251.74

8,088.00

$ 61,900

..$ 10,928 $ 50,972

$5,000 of the above is to be met from savings under head 31, sub-head

$18,360 20,000

76 (1931 Estimates page 95). (C.S.O. 3190/25).

38,360

52.—31, Public Works Extraordinary :-77, Shamshuipo Ferry Pier: To complete work

7.812.00

$ 12,612

Provision made in Estimates (page 95 sub-head 77)...S

15,000

Say.. $12,600.

(C.8.0. 61 in 468/29).

49.-35, Charitable Services:-Grant in aid Flood Relief Fund

With the approval of the Secretary of State and the Finance Commit- tee of the Legislative Council, Government has donated a sum of $20,000 to the Tung Wah Hospital to be used for relief work in the Liang Kwang Provinces where great distress has occurred as the result of the floods.

A formal vote is now required. (C.S.O. 1 in 502/31).

* 50-31, Public Works Extraordinary :-44, Kowloon General Works, Miscellaneous: Provision of 2 covered ways at Traffic Circus, Tsim Tsa Tsui..

Provision made in Estimates (page 94 sub-head 44)... $5,000

Carried forward......

Original Estimate...

135,167

Revised Estimate

135,781

Work completed to 31 12.20

$ 15,770

20,000.00

Work completed to 31.12.30

97,699

Provision made in 1931

15,000

Provision to be made in 1932

Nil.

128,469

Amount now required to complete.

$

7,312

Amount underestimated due to increased

cost of materials

603

Balance unexpended not provided in 1931 Estimates now requested for revote...

6,709

7,312

3,000,00

(C.8.0. 3190/25.)

.$ 107,251.74

Carried forward......... $122,651.74