28

and running of ferry boats should be

reserved for the present. In any case, an

immediate expenditure of about £41,250

would be required for the re-construction and

improvement of the existing ferry system

even if the proposed new vehicular ferry berth

is not to be substituted for it. The cost

of the additional construction necessary, if

it were substituted, is estimated at £18,750 making

a total of £60,000 for the work on the Island.

On the Kowloon (main) and) side re-construction

work has already been begun at two terminal

points (Shamshuipo and Mongkok tsui). At

another major terminal point (Yaumati) an

immediate expenditure of £8,250 is required

if it is to continue to be used as a ferry

pier. The cost of the proposed vehicular

ferry pier is estimated at £37,000 which

would release for public purposes the

existing pier without incurring any

additional expenditure.

The additional expense therefore of

adopting