- 6 -

183

Dam 2A.

Catchwaters.

Filter Beds.

Dam No.2A or Needle Hill Dan. With the raising of

the Top Water Level of the Gorge Dam to about 600 A.0.D. a

large portion of the basin of Needle Hill Reservoir is

included in the Gorge Damn Reservoir.

For this reason and also owing to the fact that on

closer investigation this Site has not proved so favourable as at one time hoped for, I would recommend that this dam

be abandoned.

The catchwaters discharging through Lead Mine Pass present no particular difficulties apart from their being situated at a very high level and are therefore somewhat

inaccessible. They should be put in hand while the Reservoir

is under construction, but are not so urgent.

The filter beds will be an extension of the

existing plant and should be dealt with early. The existing plant has been designed to allow of extension when necessary.

A second pipe line should not be required until

the Reservoir is almost completed, so need not be considered

at the moment.

24" Pipe Line.

Gin Drinkers Bay Reservoir.

Shing Mun Scheme - Fifth Section. With a view to

getting some little idea of the possibilities of the Gin Drinkers Bay Reservoir Site, I have had a series of bore holes put down along the line of the Lower Dam Site, but wit very disappointing results.

The bores show that bedrock is only reached at a depth of about sixty feet, and that, over a large section

of the Dam.

The cost of a dam on this site would appear

excessive.

Borings are proceeding on the upper site which it

is hoped will prove more favourable.

It