139

90

Head 32.--KOWLOON CANTON RAILWAY

Approved Estimate, 1929.

Estimate, 1980,

Head 32. KOWLOON CANTON RAILWAY

Approved Estimate, 1929.

Estimate, 1920.

KOWLOON CANTON RAILWAY,-Continued.

KOWLOON CANTON RAILWAY,—Continued.

Other Charges, Continued

Brought forward

Other Charges,-Continued

S

Brought forward

$

643,799

$

650,991

553,993

560,038

Sub-heads :-

Sub-heads :-—

12 Hire of Rolling Stock.

E-2-8-2 Hire of Rolling Stock

13 Incidental Expenses.

25 Signals and Switches.

100

100

100

100

>>

E-5-6 Maintenance of Signals

Points and Crossings

1,600 800

1,600 2,000

(1)

2,400

3,600

E-1-5-3 Stores

250

250

26 Sleepers,

E-1-6 Head Office

750

750

E-5-1-3 Maintenance of Way and Structures..

260

250

E-5-5-2 Sleepers

36,000

48,000

1,250

1,250

36,000

(2)

48,000

14 Locomotive Repairs.

27 Stations and Buildings and Staff Quarters,

E-4-2-1 Materials for Repairs and Renewals

Painting Contract

50,000

50,000

780

780

50,780

50,780

E-5-7-2 Repairs, Stations and Buildings....... Maintenance of Turret Clock

7,200

4,000

(3)

100

340

17

15 Lubricants.

E-5-7-3 Repairs, Staff Quarters

7,000

3,500

; (3)

E-3-1-4 Locomotive Oil....

9,000

9,000

14,300

7,840

E-3-2-2 Carriages and Wagons, Oil

2,000

2,000

28 Stores.

E-3-3-2 Oil Fuel for Motor Coaches

5,000

5,000

16,000

16,000

E-2-4-1 Stations....

4,000

4,000

16 Medical and Sanitation.

E-1-9-2 First aid Bandages, up-keep of Ambulance Boxes

etc. on trains

E-3-1-5 Locomotives, Miscellaneous Stores..... E-3-2-3 Carriages and Wagons, Miscellaneous Stores

6,000

6,000

5,000

5,000

150

200

(1)

15,000

15,000

150

200

29 Telegraphs.

17 Minor Works (Maintenance of Way and Structures).

E-5-11 New Minor Works

2,000

2,000

E-5-14-2 Maintenance of Telegraphis and Telephones

2,250

2,250

E-5-12-6 Minor Repairs

250

250

2,250

2,250

2,250

2,250

30 Tools and Plant,

18 Miscellaneous.

E-1-16 Prizes for Best kept length of Line

24

24

E-4-8-1 Plant (Workshops)

5,000

5,000

E-I-7-3 Stores Depreciation.....

100

100

E-1-8-2 Tools (Workshops).

2,250

2,250

124

124

E-5-9-1 Plant (Main. of Way and Structures)..

825

575 (3)

19 Nightsoil Disposal,

E-5-9-2 Tools (Main, of Way and Structures)

1,400

1,400 F

E-2-2-3 Nightsoil Disposal

264

264

9,475

9,225

264

261

31 Transport,

20 Plantations.

E-5-12-4 Plantations.......

21 Power, Electric Fans and Light.

E-1-3-3 Stores

500

500

E-1-7-4 Transport.....................

550

330

500

500

550

550

82 Tunnels.

115

115

E-1-6 Head Office

1,000

1,000

E-5-3

Tunnels..........................

E-2-4-1 Stations

1,150

1,150

1,000

1,000

1,000

1,000

E-4-9 Central Mechanical Works................

22 Printing and Stationery.

6,000

6,500

33 Uniform.

E-5-14-2 Maintenance of Faus and Light

900

1,000

(1)

9,165

9,763

E-1-7-6

Uniform for 6 Stores Watchmen, 1 Office

Attendant and I Messenger

395

395

E-1-5-3 Stores

60

60

E-2-3

Station and Train Staff

4,540

4,540

E-1-6

Head Office......

540

540

Uniform for 7 Watchmen

455

455

25

E-2-5

Printing, Stationery and Tickets

2,200

2.200

E-3-1-1-1 Uniform for Drivers, Firemen, Pointsmen....

680

680

E-3-1-1-4 Running Expenses

200

200

E-4-11-3 Uniform for Watchmen

625

625

E-5-1-3 Maintenance of Way and Structures

500

600

E-5-12-6 Uniform for 5 Watchmen and 3 Sub-Inspectors...

455

455

3,500

3,500

7,150

7,150

28 Rails and Fastenings.

34 Motor Cars and Lorries, Running Expenses

10,470

10,470

E-5-5-3 Fastenings

1,000

1,000

10,470

10,470

Rails

13

1,500

2,000

(3)

2,500

3,000

Carried forward

----་

742,394

756,079

24 Rents.

E-1-13 Rent of Shum Chun Station

3,228

3.223

3.223

3,223

(1) Renewals necessary.

(3) Considered sufficient.

(2) Heavy sleeper renewals.

(4) Allowance to Electrician attending Electric Clocks.

Carried forward

643,799

650,994

(1) Considered necessary,

(2) More repairs anticipated.

(3) Increased renewals.

140

91

Share This Page