3

3. how: bouf

18.6.30

Traus report

on second section

of

the

Shing keen Valley Waterworks Scheme

The scheme was generally approved in principle by the S. of S. in 1928 (41 ins 52819); this desp: contains the technical details of

seen 2 of the SHING MUN scheme upon which is is now desired to begin

work.

We shall require

expert advice upon the proposals.

with

? Duplicase desp: lucls: in original and a copy of S.P. 4/1929 (copy herein) to CA.

-plans and the S.P. to be rehimed with the reply. for obris: suggesting that should they think

They will

*CA have his in necessary.

address.

arrange to discuss with

17: Henderson.

Жилинь

Recire: for curideration

to be given in the meantime

Share This Page