307

COMPARATIVE STATEMENT OF THE ESTIMATED AND ACTUAL

56

Heads and Sub-Heads.

Brought forward

32. KOWLOON CANTON RAILWAY.

Sub-heads:

1 Personal Emoluments

Estimated.

Actual.

Increase.

Decrease.

$

19,452,878

19,430,437.34

1,740,077.09

1,762,517.75

362,776

355,648.91

7,127.09

OTHER CHARGES.

2 Advertising.

E-1-7-2 Advertising

2,500

2,496.48

3.52

3 Ballast.

E-5-5-4 Ballast

1,750

651.47

E-5-8 Central Mechanical Works

500

1,098.53 500.00

4 Bridgework.

E-5-1 Bridges

2,000

1,183.86

816.14

5 Carriages Repairs.

E-4-3-1 Materials for Repairs and

Renewals

20,000

E-4-3-1 Painting Contract

2,730

18,208.20 2,080.00

1,791.80 650.00

6 Coal.

E-1-5-3 Coal for Office and Stores... E-1-6 Coal for Head Office

E-3-1-2-1 Coal for Locomotives

(16,000 tons)

E-3-1-2-5 Loading Coal

E-3-1-2-3 Unloading Ashes

25

150

59.80

250,000

2,500

900

211,277.61 1,886.41 592.00

11

111

7 Compensation.

E-1-14 Compensation

100

1

8 Conveyance Allowances.

E-1-7-6 Conveyance Allowance to

Storekeeper

90

90.00

E-2-8-2 Conveyance Allowance to

Traffic Manager

90

90.00

E-2-8-2 Conveyance Allowance to

Relieving Station Masters

36

36.00

E-2-8-2 Conveyance Allowance to

Disabled Clerk

144

144.00

E-2-8-2 Conveyance Allowance to

Traffic Inspectors

50

E-5-1-2 Motor Allowance to

Chief Engineer

25

Extra Allowances

9 Formation and Line Protection.

25.00 186.39

186.39

3,000 750 1,000

2,540.39

155.86

936.01

25.00 90.20

38,722.39

613.59 308.00

100.00

50.00

E-5-2 Earthwork

E-5-2 Fencing

E-5-2 Roads Crossings

459.61

594.14

63.99

10 Furniture,

E-2-4-2 Fittings and Furnitures

500

95.88

404.12

11 Goods Wagons Repairs.

E-4-4-1 Materials for Repairs and

Renewals

E-4-4-1 Painting Contract

5,000 1,625

4,989.12 1,040.00

10.88 585.00

Carried forward

Carried forward

658,241

604,413.39

186.39

19,452,878

19,430,437.34

1,740,077.09

54,014.00

1,762,517.75

Page 260Page 261

Share This Page