301

50

COMPARATIVE STATEMENT OF THE ESTIMATED AND ACTUAL

EXPENDITURE OF THE COLONY OF HONG KONG FOR THE YEAR 1931

51

Heads and Sub-Heads,

Estimated.

Actual.

Increase.

Decrease.

Provisionally

Explanatory Remarks.

Voted,

$

$

$

$

Brought forward

31.-PUBLIC WORKS EXTRAORDIN.

ARY.-Continued.

16,952,878 17,055,505.35 1,267,452.61 1,164,825.29

Brought forward

DRAINAGE,

49 Ma Tau Chung Extension of Culvert to

Argyle Street (Ma Tau Wei Village).|

MISCELLANEOUS.

1,673,045

1,400,372.33

111,619.52

384,292.19

135,007.00

15,000

14,801.67

50 Chinese Cemeteries-Laying out new

area

7,000

51 Renewing electrical wiring at Yaumati

Slipway

1,000

6,987.17

828.83

52 Playing Field-preparing areas recom-

mended by the Committee as such inay be approved

1,000

WATER WORKS.

53 Distributing Water Mains

15,000

18,317.64

3,317.64

PORT WORKS.

54 Mong Kok Tsui Ferry

15,000

21,250.76

6,250.76

PUBLIC HEALTH & BUILDINGS ORDINANCE.

55 Compensation & Resumptions.........

30,000

12,590.66

NEW KOWLOON.

BUILDINGS.

56 Married Quarters, Lai Chi Kok Prison.

57 New Female Prison, Lai Chi Kok

58 Latrine at Kowloon Tong Waterloo

Road (Park area)

GENERAL WORKS.

199.33

12.83

171.17

1,000.00

17,409.34

1

¡

Not required.

5,000.00

Less work done.

8,088.00

86,000

100,000

65,744.26 144,083.45

20,255.74

44,088.45

48,000.00

2,500

2,500,00

59 Roads

80,000

68,929.80

11,070.20

60 Drainage:-

(a) Training Nullahs

8,000

2,166.54

5,833.46

(b) Miscellaneous Drainage Works..

80,000

97,036.07

17,086.07

32,000.00

61 Miscellaneous

5,000

62 Water Works

5,000

2,403.18 3,608.05

2,596.52

1,391.95

63 Port Works

500

500.00

COMMUNICATIONS,

Increased cost due to lower exchange; Retention money carried over to 1932.

Fewer resumptions.

Retention money carried over to 1932. More work done than anticipated.

Postponed.

Work reduced as far as possible.

Work curtailed,

More work found necessary than anticipated. Work kept to a minimum,

do.

64 Access Road (15 feet wide) to Christian

Chinese Cemetery, Kowloon City

5,000

4,343.77

656.23

Work completed at less cost than anticipated.

65 Castle Peak Road, section from

Cheungshawan to Lai Chi Kok to Town Planning Layout (60 feet wide)

15,000

12,678.55

2,321.45

do.

66 Improving Existing Main Roads for

Motor Traffic

20,000

20,000.00

Postponed.

Carried forward

$

2,164,045

1,876,143.08

182,307.44 470,209.41

228,095.00

Carried forward

16,952,878 17,055,505.85

1,267,452,64 1,164,825.29

302