Head 31. PUBLIC WORKS EXTRAORDINARY

Head 32. KOWLOON CANTON RAILWAY

Estimate.

Expenditure Approved Revised

Estimated Estimated up to 31st December, Expenditure, Expenditure,

Estirated Expenditure,

PUBLIC WORKS

1931

1929.

1930.

1930.

Approved Estimate, 1930.

Estimate, 1931.

$

$

$

EXTRAORDINARY,-Continued.

Head 32. KOWLOON CANTON RAILWAY

3

$

$

Brought forward

NEW TERRITORIES,

2,371,545

Sub-heads:

1 Personal Emoluments

293,748

362,776

BUILDINGS.

TO

School at Un Loong

Other Charges

45,000

15,000

80 Quarters for Forestry Reserve, Taipo

2,500

30,000 2,500

2 Advertising.

E-1-7-2 Advertising

2,500

2,500

2,500

2,500

GENERAL WORKS.

81 Roads

2,000

82 Drainage:—

(a) Training Nullahs

3,000

(b) Miscellaneous Drainage Works

5,000

83 Miscellaneous

7,500

81 Water Works

1,000

3 Bullast.

:

2,000

E-5-5-4 Ballast E-5-8

2,250

1.750

Central Mechanical Works

(1)

500

500

3,000

2,750

2,250

8,500

4,000

4 Bridgework.

1,000

-5-1 Bridges..

2,000

2,000

2,000

2,000

ය‍::

9,660 50,000

30,000

COMMUNICATIONS.

85 Patrol Path from Lin Ma Hang to Sha-

taukok

86 Reconditioning of Roads

80,000

87 Widening Kam Tin Rond to 20 feet

6,000

MISCELLANEOUS.

88 New Telephone Switch Board for Tai

Po Police Station

89 Un Long Nullahs and Improvements 90 Tai Po Land Office European Lavatory

and Small Store

2,600 5,000

2,600

3,000

1,255

1,255

91 Compensation and Resumptions

5,000

3,000

7 Compensation.

E-1-14 Compensation

92 Windmill for irrigation purposes

13,000

3,000

93 Arms Grilles for New Territories Police

Stations

3,600

3,600

8 Conveyance Allowances.

WATER WORKS.

94 Improvements to Fan Ling Water

**

Works

20,000

5,000

5 Carriages Repairs.

45,400

1)

25,000

E-4-3-1 Materials for Repairs and Renewals Painting Contract...................................

20,000

20,000

2,730

2,730

30,000

22,780

22,730

6,000

6 Coal.

E-1-5-3 Coal for Office and Stores

E-1-6 Coal for Head Office

35 250

25

150

E-3-1-2-1 Coal for Locomotives (16,000 tons) E-8-1-2-3 Loading Coal

(1)

230,400

250,000

2,300

77

Unloading Ashes

*00

900)

2,500 (2)

283,775

258,576

100

100

100

100

Total

2,500,000

E-1-7-6 Conveyance Allowance to Storekeeper.. E-2-8-2 Conveyance Allowance to Traffic Manager

Conveyance Allowance to Relieving Station Masters Conveyance Allowance to Disabled Clerk Conveyance Allowance to Traffic Inspectors E-5-1-2 Motor Allowance to Chief Engineer..

77

9 Formation and Line Protection.

E-5-2 Earthwork

I

90

90

60

90

36

26

144

144

50

50

150

25

(3)

560

435

11

Fencing

#

Roads Crossings

10 Furniture.

E-2-4-2 Fittings and Furnitures......

8,000

3,000

750

750

1,000

1,000

4,750

4,750

500

500

500

500

11 Goods Wagons Repairs.

++

E-4-4- Materials for Repairs and Renewals

Painting Contracı

5,000

5,000

1,625

1,625

Carried forward

6,625

560,038

6,625

658,241

(1) Considered sufficient.

(2) More coal required.

(3) Officer on leave.