267

268

90

Head 32. KOWLOON CANTON RAILWAY

Approved Estimate, 1929.

Estimate, 1980.

Head 32.- KOWLOON CANTON RAILWAY

91

Approved Estimate, 1929.

Estimate, 1920.

KOWLOON CANTON RAILWAY,-Continued.

Other Charges,—Continued

KOWLOON CANTON RAILWAY,—Continued.

$

Other Charges,--Continued

$

$

Brought forward

Brought forward

613,799

$

650,991

553,993

560,038

Sub-heads -

Sub-heads :-

12 Hire of Rolling Stock.

25 Signals and Switches,

E-2-8-2 Hire of Rolling Stock

100

100

100

100

13 Incidental Expenses.

»

E-5-6 Maintenance of Signals

Points and Crossings

1,600 800

1,600 2,000

(1)

E-1-5-3 Stores

2,400

3,600

250

250

E-1-6 Head Office

26 Sleepers.

750

750

E-5-1-3 Maintenance of Way and Structures.

250

250

E-5-5-2 Sleepers

36,000

48,000

(2)

1,250

1.250

14 Locomotive Repairs.

36,000

48,000

"}}

E-4-2-1 Materials for Repairs and Renewals

Painting Contract

27 Stations and Buildings and Staff Quarters.

50.000

780

50,000 780

50,750

50,780

15 Lubricants.

E-5-7-2 Repairs, Stations and Buildings.....

Maintenance of Turret Clock

7,200

4,000

(3)

100

M

840 (4)

E-3-1-4 Locomotive Oil....

E-5-7-3 Repairs, Staff Quarters

7,000

3,500

+(3)

9,000

9,000

E-3-2-2 Carriages and Wagons, Oil

14,300

7,840

2,000

2.000

E-3-3-2 Oil Fuel for Motor Conchies

28 Stores.

5,000

5,000

16,000

16 Medical and Sanitation,

16,000

E-2-4-1 Stations.....

4,000

4,000

E-1-9-2 First aid Bandages, up-keep of Ambulance Boxes

etc. on trains

E-3-1-5 Locomotives, Miscellaneous Stores..... E-3-2-3 Carriages and Wagons, Miscellaucous Stores

6,000

6,000

5,000

5,000

150

200

(1)

15,000

15,000

150

200

17 Minor Works (Maintenance of Way and Structures).

E-5-11 New Minor Works

29 Telegraphs.

2,000

2,000

E-5-12-6 Minor Repairs

E-5-14-2 Maintenance of Telegraphs and Telephones

2,250

2,250

250

250

2,250

2,250

2,250

2,250

18 Miscellaneous.

30 Tools and Plant,

E-1-16 Prizes for Best kept length of Line

24

24

E-1-7-3 Stores Depreciation.....

E-4-8-1 Plant (Workshops)

5.000

5,000

100

100

E-4-8-2 Tools (Workshops)

2,250

2,250

124

124

19 Nightsoil Disposul.

F-2-2-3 Nightsoil Disposal

E-3-9-1 Plant (Main. of Way and Structures) E-5-9-2 Tools (Main. of Way and Structures)

825

575

(8)

1,400

1,400

264

264

9,475

9,225

264

264

20 Plantations.

E-5-12-4 Plantations...

21 Power, Electric Fans and Light.

E-1-5-3 Stores

31 Transport.

300

500

E-1-7-4 Transport

500

500

550

550

550

550

32 Tunnels,

115

115

E-1-6 Head Office

1,000

1,000

E-2-4-1 Stations

E-5-3

Tunnels......

1,150

1,150

E-4-9 Central Mechanical Works....

1,000

1,000

1,000

1,000

6,000

6,500 (2)

E-5-14-2 Maintenance of Fans and Light

900

1,000

(1)

33 Uniform.

9,165

9,765

22 Printing and Stationery.

E-1-7-6

E-1-5-3 Stores

Uniform for 6 Stores Watchmen, 1 Office

Attendant and 1 Messenger

395

395

60

60

E-I-6

Head Office

E-2-3

Station and Train Staff

4,540

4,540

540

540

Uniform for 7 Watchmen

E-2-5

Printing, Stationery and Tickets

455

455

37

2,200

2,200

E-3-1-1-4 Running Expenses

E-3-1-1-4 Uniform for Drivers, Firemeu, Pointsmen.

6×0

680

200

200

E-5-1-3 Maintenance of Way and Structures

E-4-11-3 Uniform for Watchinen

625

625

500

500

E-5-12.6 Uniform for 5 Watchmen and 3 Sub-Inspectors...

455

455

23 Rails and Fastenings.

3,500

3,500

7,150

7,150

E-5-5-3 Fastenings

34 Motor Cars and Lorries, Running ExpensES

10,470

10,470

1,000

1,000

Rails

10,470

10,470

כי

1,500

2,000 (3)

2,500

3,000

24 Rents.

Carried forward

742,394

756,079

E-1-13 Rent of Shum Chun Station

3,228

3,223

3,223

3,223

(1) Renewals necessary.

(3) Considered sufficient.

Carried forward

(2) Heavy sleeper renewals.

(4) Allowance to Electrician attending Electric Clocks.

643,709

650,994

(1) Considered necessary. (2) More repairs anticipated.

(3) Increased renewals.

Share This Page