Item
62
(Page 6)
Increased from
to
Increase
$17,000
$39,000
16,100
78,000
$22,000 61,900
1,000
6,500
5,500
Dehumidifying plant
10,000
$99,400
6 •
of this total increase $20,400 is required
additional to the $68,790 already tentatively approved,
for this year '1928).
7.
I ask for approval of the amended scheme as
a whole the expenditure for 1929 to be included in the
Estimates now being prepared, as serious loss would be
involved if it is in part abandoned.
(Signed) L.H. KING,
Engineer-in-Charge.
Electrical Sub-Station.
-15-
8.6.28.