Item

62

(Page 6)

Increased from

to

Increase

$17,000

$39,000

16,100

78,000

$22,000 61,900

1,000

6,500

5,500

Dehumidifying plant

10,000

$99,400

6 •

of this total increase $20,400 is required

additional to the $68,790 already tentatively approved,

for this year '1928).

7.

I ask for approval of the amended scheme as

a whole the expenditure for 1929 to be included in the

Estimates now being prepared, as serious loss would be

involved if it is in part abandoned.

(Signed) L.H. KING,

Engineer-in-Charge.

Electrical Sub-Station.

-15-

8.6.28.

Share This Page