Item
No.
15.
Details of items of expenditure.
5%
Description of Work.
Financial Provision
Required in
1928
1929
1. One 200 ft.
2.
3.
Steel Mast
Foundation for above.
Alterations to Buildings at D'Aguilar
Workshop and Store to replace space in old building now required for new plant
To provide for expenses incurred in preparation of road site and/or buildings for new receiving station
Addition to Power Plant
One 5 K. Motor Generator
One Filament Supply Generator
One Filament Battery
Six Filament Transformers
Three High Tension Generators
Duplication of existing Storage Battery
Additional Transmitting Plant
4.
Two 500 watt short wave transmitters
with independent drive
One 5 KW. C/ICW transmitter for ship
traffic (required under new regulations).
One half KW.ICW. transmitter for work-
ing ships in close vicinity of Harbour
One 5 KW. short wave transmitter for
working long range traffic
Carried Forward.
17000
3350
2750
10000
3600
500
500
600
2500
5160
24000
14400
5000
50000
54800
84560