84

of interruption owing to fouling by

ships' anchors, and I consider that

the alternative proposed viz. burying

in harbour and protecting by concrete

by triem should be adopted. Lowest

^

tender received for the work on this

basis was two million dollars but if it

were under taken departmentally with the

assistance of an Engineer experienced in

similar work engaged specially for it,

cost would be reduced to $1,500,000.

I fucker consider it

Essential that the pipe like shed, be in

duplicate.

if you agree to work being done departmentally

C.A. would be asked to select a suitable

Engineer for temporary engagement.

have learnt with regret of antici-

sinre

pated sewer shortage but would point out

that, as pipes would have to be manufactured

emanu

laying down of pipes cannot begin in any

yrai's Typhoon

case till after next hurricane season so

adoption of Engineers alternative would

not materially delay the additional supply.

Expenditure should be met immediately

Cspecially

out

Page 90Page 91

Share This Page